APERC · Andhra Pradesh Electricity Regulatory Commission
Andhra Pradesh Licensees' Standards of Performance Regulation, 2004 — Consolidated
Andhra Pradesh Electricity Regulatory Commission (Licensees' Standards of Performance) Regulation, 2004
Consolidated copyDated 31 Dec 2025Regulation No. 7 of 2004
A consolidated copy of the Licensees' Standards of Performance Regulation, 2004, published by APERC for reference. It may not include the latest amendments; read it with the amendments listed for the regulation.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is the consolidated text of the APERC (Licensees' Standards of Performance) Regulation, 2004 (Regulation No. 7 of 2004), as amended six times up to October 2025. It is a consumer-service regulation: it tells AP distribution licensees what service levels they must meet and what they must pay consumers when they fall short. Page 1 carries the amendment history table; pages 2–7 are the operative regulation (title, scope, definitions, guaranteed vs overall standards, compensation, reporting, exemptions, powers, repeal), and pages 8–25 are the three Schedules. Schedule I (pp8–14) sets the guaranteed standards — restoration times for fuse-off calls, overhead/underground cable breakdowns and transformer failures; scheduled-outage notice and duration; voltage fluctuation and harmonic limits; meter inspection and replacement; new-connection and load-release timelines by voltage class; transfer of ownership and service conversion. Schedule II (pp15–21) pairs each guaranteed standard with the compensation payable and sets out how compensation is claimed, auto-paid or adjusted in bills, plus CGRF and Ombudsman escalation and reporting annexures. Schedule III (pp22–25) sets overall standards (percentage-based targets, street-light faults, IEEE 1366 reliability indices, frequency variation, voltage unbalance, billing mistakes and faulty meters), with targets for reliability indices deferred to future Commission notification. The document matters mainly as the operative consumer-compensation benchmark and reporting template for AP discoms.
Read with this
The regulation
- Dated 22 Jun 2004Licensees' Standards of Performance Regulation, 2004
Amendments and corrections
- Published in the Gazette 19 Aug 2005Licensees' Standards of Performance Regulation, 2004 — First Amendment, 2005
- Dated 7 Aug 2013Licensees' Standards of Performance Regulation, 2004 — Second Amendment, 2013
- Dated 4 Jun 2021Licensees' Standards of Performance Regulation, 2004 — 3rd Amendment, 2021
Commencement notices and reasons
Procedures and orders made under it
- Dated 30 Jun 2017Practice Directions on SAIFI and SAIDI Benchmarking for Industrial Feeders, 2017
- Dated 27 Aug 2024Licensees' Standards of Performance Regulation, 2004 — Fifth Amendment, 2024
- Dated 20 May 2026Licensees Standards of Performance (Regulation No. 7 of 2004) — Practice Directions on SAIDI and SAIFI, 2026
Earlier drafts
One more document belongs here and is not on Voltaic: a draft or notice on a draft.
Voltaic last read APERC's website for final documents on 24 Nov 2026 (2 pages) and for drafts on 21 Nov 2026. A document APERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.