APERC · Andhra Pradesh Electricity Regulatory Commission
Licensees' Standards of Performance Regulation, 2004
Andhra Pradesh Electricity Regulatory Commission (Licensees' Standards ofPerformance) Regulation, 2004
RegulationDated 22 Jun 2004Published in the Gazette 22 Jun 2004Regulation No. 7 of 2004 dated JUNE 22, 2004
3 amendments to it are on Voltaic, the latest dated 4 Jun 2021.
Summary
Summary written by software. Check the regulator's original before you rely on it.
Regulation No. 7 of 2004, gazetted 22 June 2004 (p1), is the Andhra Pradesh Electricity Regulatory Commission's service-quality code for distribution licensees. It replaces the 2000 Standards of Performance Regulation and turns those standards into enforceable obligations by attaching consumer compensation, using the powers in sections 57 and 59 of the Electricity Act, 2003 (p1).
Clauses 1–3 (p1–2) fix the scope: it applies to every licensee engaged in distribution of electricity in Andhra Pradesh, extends to the whole State, and comes into force on Gazette publication. Voltage classes, urban and rural areas, 'area of supply' and 'Licensee' are defined. Schedule-I standards are the *guaranteed* minimum a licensee must meet; Schedule-III standards are *overall* targets it must seek to achieve; the Commission may add to or amend all three Schedules (p2).
Schedule-I (p5–9) is the operational core: maximum restoration times after normal fuse-off calls, overhead line/cable and underground cable breakdowns, and distribution transformer failures, separately for towns/cities and rural areas; advance notice and duration caps for scheduled outages; voltage-fluctuation limits at the point of supply with repair and network-upgrade timelines; harmonics limits staged by voltage level; inspection and replacement of meters and burnt meters; timelines for releasing new connections from existing network or after mains extension, and for substation-based supply; transfer of ownership, change of category and LT/HT conversion; and resolution of bill complaints and reconnection after disconnection.
Schedule-II (p10–12) sets the compensation for each violation, distinguishing a single affected consumer from an event affecting many, and requires payment by adjustment against current or future bills within 90 days of the violation, failing which the consumer may approach the consumer grievances Forum. Compensation is phased in: towns and cities three months after notification, rural areas one year after publication, and multi-consumer events after one year pending consumer indexing (p3).
Schedule-III (p12–14) sets percentage-based overall targets for fuse-off calls, line breakdowns, transformer replacement, scheduled outages and street lights, plus IEEE 1366 reliability indices (SAIFI, SAIDI, MAIFI), frequency and voltage-unbalance monitoring, and ceilings on billing mistakes and faulty meters. Clauses 5–6 (p3–4) require monthly, quarterly and annual reporting to the Commission, and exempt licensees for force majeure, grid failure, transmission faults and SLDC instructions.
Read with this
Amendments and corrections
- Published in the Gazette 19 Aug 2005Licensees' Standards of Performance Regulation, 2004 — First Amendment, 2005
- Dated 7 Aug 2013Licensees' Standards of Performance Regulation, 2004 — Second Amendment, 2013
- Dated 4 Jun 2021Licensees' Standards of Performance Regulation, 2004 — 3rd Amendment, 2021
Commencement notices and reasons
Procedures and orders made under it
- Dated 30 Jun 2017Practice Directions on SAIFI and SAIDI Benchmarking for Industrial Feeders, 2017
- Dated 27 Aug 2024Licensees' Standards of Performance Regulation, 2004 — Fifth Amendment, 2024
- Dated 20 May 2026Licensees Standards of Performance (Regulation No. 7 of 2004) — Practice Directions on SAIDI and SAIFI, 2026
Consolidated copies, for reference (1)
Earlier drafts
One more document belongs here and is not on Voltaic: a draft or notice on a draft.
Voltaic last read APERC's website for final documents on 24 Nov 2026 (2 pages) and for drafts on 21 Nov 2026. A document APERC issued after the page that lists it was read may not be held by Voltaic yet.
As of its reading of APERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.