Skip to content

APERC · Andhra Pradesh Electricity Regulatory Commission

Licensees' Standards of Performance Regulation, 2004 — Fifth Amendment, 2024

Fifth Amendment to Andhra Pradesh Electricity Regulatory Commission (Licensees' Standards of Performance) Regulation 2024

OrderDated 27 Aug 2024Regulation 6 of 2024 dated 27.08.2024

Made under the Licensees' Standards of Performance Regulation, 2004.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on aperc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is an APERC order dated 27 August 2024 that makes the Fifth Amendment to the APERC (Licensees' Standards of Performance) Regulation, 2004 (Regulation No. 7 of 2004). Pages 1-2 are the Commission's order: it traces the parent regulation's history through its earlier amendments and the 2014 Adoption Regulation, records that the Government of India's Electricity (Rights of Consumers) Amendment Rules, 2024 (22 February 2024) set timelines for distribution licensees to give new connections and advised SERCs to align, and notes that the DISCOMs asked the Commission to issue proceedings. The Commission says it hosted draft amendments with a public notice on 26.07.2024, invited comments by 09.08.2024, received none, and adopted the draft as the final regulation.

Pages 3-4 are the Annexure: the amending regulation itself. Clause 1 gives the short title, extends the amendment to the whole of Andhra Pradesh and brings it into force on the date of publication in the Andhra Pradesh Gazette — the Gazette date is not printed. Clause 2 substitutes Item IX of Schedule II of the Principal Regulation in full.

The substituted Item IX is the operative content. It sets service standards and per-day compensation for release of a new connection or additional load on payment of all charges, in two situations: where the connection is feasible from the existing network, with time standards differentiated by metropolitan, other municipal and rural areas running from receipt of the complete application with charges (p3); and where network expansion or enhancement is needed, with separate timelines by voltage level — LT, HT 11 kV, HT 33 kV and EHT — from receipt of prescribed charges, plus a case where a new substation must be commissioned before supply (p4). Compensation accrues per day of default to the affected consumer, at different rates by category, and only where the event affects a single consumer; the column for events affecting more than one consumer reads "Not applicable" (pp3-4).

Standard name
Standards of Performance
Primary topics
Standards of performance, New connections and load changes

Read with this

The regulation

Consolidated copies, for reference (1)

One more document belongs here and is not on Voltaic: a draft or notice on a draft.

Voltaic last read APERC's website for final documents on 24 Nov 2026 (2 pages) and for drafts on 21 Nov 2026. A document APERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on aperc.gov.in ↗

Report an issue with this document