APERC · Andhra Pradesh Electricity Regulatory Commission
Licensees' Standards of Performance Regulation, 2004 — Fifth Amendment, 2024
Fifth Amendment to Andhra Pradesh Electricity Regulatory Commission (Licensees' Standards of Performance) Regulation 2024
OrderDated 27 Aug 2024Regulation 6 of 2024 dated 27.08.2024
Made under the Licensees' Standards of Performance Regulation, 2004.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is an APERC order dated 27 August 2024 that makes the Fifth Amendment to the APERC (Licensees' Standards of Performance) Regulation, 2004 (Regulation No. 7 of 2004). Pages 1-2 are the Commission's order: it traces the parent regulation's history through its earlier amendments and the 2014 Adoption Regulation, records that the Government of India's Electricity (Rights of Consumers) Amendment Rules, 2024 (22 February 2024) set timelines for distribution licensees to give new connections and advised SERCs to align, and notes that the DISCOMs asked the Commission to issue proceedings. The Commission says it hosted draft amendments with a public notice on 26.07.2024, invited comments by 09.08.2024, received none, and adopted the draft as the final regulation.
Pages 3-4 are the Annexure: the amending regulation itself. Clause 1 gives the short title, extends the amendment to the whole of Andhra Pradesh and brings it into force on the date of publication in the Andhra Pradesh Gazette — the Gazette date is not printed. Clause 2 substitutes Item IX of Schedule II of the Principal Regulation in full.
The substituted Item IX is the operative content. It sets service standards and per-day compensation for release of a new connection or additional load on payment of all charges, in two situations: where the connection is feasible from the existing network, with time standards differentiated by metropolitan, other municipal and rural areas running from receipt of the complete application with charges (p3); and where network expansion or enhancement is needed, with separate timelines by voltage level — LT, HT 11 kV, HT 33 kV and EHT — from receipt of prescribed charges, plus a case where a new substation must be commissioned before supply (p4). Compensation accrues per day of default to the affected consumer, at different rates by category, and only where the event affects a single consumer; the column for events affecting more than one consumer reads "Not applicable" (pp3-4).
Read with this
The regulation
- Dated 22 Jun 2004Licensees' Standards of Performance Regulation, 2004
Amendments and corrections
- Published in the Gazette 19 Aug 2005Licensees' Standards of Performance Regulation, 2004 — First Amendment, 2005
- Dated 7 Aug 2013Licensees' Standards of Performance Regulation, 2004 — Second Amendment, 2013
- Dated 4 Jun 2021Licensees' Standards of Performance Regulation, 2004 — 3rd Amendment, 2021
Commencement notices and reasons
Procedures and orders made under it
Consolidated copies, for reference (1)
Earlier drafts
One more document belongs here and is not on Voltaic: a draft or notice on a draft.
Voltaic last read APERC's website for final documents on 24 Nov 2026 (2 pages) and for drafts on 21 Nov 2026. A document APERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.