APERC · Andhra Pradesh Electricity Regulatory Commission
Licensees' Standards of Performance Regulation, 2004 — Sixth Amendment, 2025 — Statement of Reasons
Sixth Amendment to Andhra Pradesh Electricity Regulatory Commission (Licensees' Standards of Performance) Regulation, 2004 (Regulation No. 7 of 2004)
Statement of reasonsDated 9 Oct 2025Regulation No. 07 of 2025 dated 09.10.2025
The commission's reasons for the Licensees' Standards of Performance Regulation, 2004 or one of its amendments.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is the Andhra Pradesh Electricity Regulatory Commission's Statement of Reasons and Order issued with the final text of the Sixth Amendment to the APERC (Licensees' Standards of Performance) Regulation, 2004 (Regulation No. 7 of 2004), numbered Regulation No. 07 of 2025 and dated 9 October 2025 from Kurnool (p1, p3).
The Statement of Reasons (pp1–2) sets out the lineage of the Principal Regulation — notified in the A.P. Extraordinary Gazette on 22.06.2004 under s.181(2)(za) and (zb) read with ss.57 and 59 of the Electricity Act, 2003 — its five earlier amendments, and its survival after state bifurcation through the APERC (Adoption) Regulation, 2014 (Regulation No.4 of 2014). It records that the Commission published a public notice and draft Sixth Amendment on its website on 12 September 2025, that APCPDCL was the only respondent, and that APCPDCL asked for the burnt-meter replacement timelines in urban areas to be relaxed on practical grounds. The Commission rejected the request, reasoning that a consumer stays without supply until a burnt meter is replaced, that the draft timelines conform with the Electricity (Rights of Consumers) Rules, 2020 notified by the Government of India on 31.12.2020, and that urban logistics make the shorter timeline workable (pp2–3).
The operative amendment sits in the Annexure (pp3–5). Clause 1 gives the short title, extends the regulation to the whole State and brings it into force from the date of publication in the official Gazette (p4). Clause 2 substitutes subparagraph 3.2 of Paragraph III of Schedule I, restating the licensee's obligation to replace burnt-out meters at its own cost within separate urban and rural timelines, and distinguishing cases where burning is attributable to the licensee from those attributable to the consumer, where the clock runs from receipt of the meter cost and corrective action (p4). Clause 3 substitutes No. VII (ii) and (iii) of Schedule II, the compensation table for meter complaints, pairing burnt-meter time standards with compensation payable for violation (p5).
Read with this
The regulation
- Dated 22 Jun 2004Licensees' Standards of Performance Regulation, 2004
Amendments and corrections
- Published in the Gazette 19 Aug 2005Licensees' Standards of Performance Regulation, 2004 — First Amendment, 2005
- Dated 7 Aug 2013Licensees' Standards of Performance Regulation, 2004 — Second Amendment, 2013
- Dated 4 Jun 2021Licensees' Standards of Performance Regulation, 2004 — 3rd Amendment, 2021
Procedures and orders made under it
- Dated 30 Jun 2017Practice Directions on SAIFI and SAIDI Benchmarking for Industrial Feeders, 2017
- Dated 27 Aug 2024Licensees' Standards of Performance Regulation, 2004 — Fifth Amendment, 2024
- Dated 20 May 2026Licensees Standards of Performance (Regulation No. 7 of 2004) — Practice Directions on SAIDI and SAIFI, 2026
Consolidated copies, for reference (1)
Earlier drafts
One more document belongs here and is not on Voltaic: a draft or notice on a draft.
Voltaic last read APERC's website for final documents on 24 Nov 2026 (2 pages) and for drafts on 21 Nov 2026. A document APERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.