Maharashtra Electricity Regulatory Commission (Renewable Purchase Obligation, its Compliance and Implementation of Renewable Energy Certificate Framework) Regulations, 2019

Statement of reasonsDated 27 Dec 2019

The commission's reasons for the Renewable Purchase Obligation and REC Framework Regulations, 2019 or one of its amendments.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on merc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This document is MERC's Statement of Reasons for the (RPO-REC) Regulations, 2019, dated 27 December 2019 (p1). It explains the public consultation on the Draft RPO-REC Regulations, 2019 notified on 26 October 2019, for which comments were invited by 18 November 2019 and 18 stakeholders responded (p1, p24). The Commission says it finalized the 2019 Regulations after considering those comments; this Statement of Reasons sets out the main issues, the comments, the Commission's analysis and the revised regulation text it decided to adopt.

After an introduction (p1), Sections 1–16 take issues one by one. The Commission retains RPO on fossil-fuel based co-generation captive plants despite CPPA's challenge, noting the Bombay High Court writ and its earlier alternative arrangement (p2–3). It revises the scope provision to refer to a minimum RPO percentage and to exclude electricity procured from hydro (p3–4), and follows MNRE's eligible RE source criteria, adding co-firing of biomass in thermal plants (p4–5). It retains 1 MW/1 MVA thresholds for captive users and open access consumers as obligated entities, with separate RPO monitoring per entity but composite solar/non-solar compliance for non-distribution licensees (p6–7).

It publishes an RPO trajectory for FY 2020-21 to FY 2024-25 with rising solar and flat non-solar percentages, explains why it did not raise non-solar targets, and adopts MoP's CPP RPO capping based on commissioning/augmentation dates (p7–11). It retains the technology-crossover facility with a route to seek more (p11), revises the composite RPO provision (p11–12), allows pre-2010 RE PPAs as eligible for RPO (p12–13), restricts over-compliance incentives to distribution licensees (p13–15), and makes the penalty framework stricter — carry-forward only to 31 March 2023 and 31 March 2025, cumulative penalties, ARR reduction for distribution licensees, REC floor price at cut-off, and a possible reduced penalty where inability is demonstrated (p15–17).

The State Agency must collect penalties through an RPO Fund/web portal, use the fund for portal costs and deposit surplus into the State Deviation Pool Account (p17–18). The Commission allows use of the national RPO portal if it meets requirements (p18–19) and revises monitoring, verification, publication, incentive/penalty computation and payment timelines, adding a per-day penalty for delay (p19–21). It adds RE pricing principles allowing RE projects to choose competitive bidding, state RE tariff, or the REC mechanism (p21–22), shifts evacuation infrastructure responsibility to the generating company (p22–23), and declines to set a separate long-term state RPO trajectory beyond MoP/GoI targets (p23). Appendix-I lists the 18 commenters (p24).

Standard name
RPO Regulations, REC Regulations
Primary topics
Renewable purchase obligation (RPO / RCO), Renewable energy certificates (REC), Renewable energy tariff

Read with this

Commencement notices and reasons

Earlier drafts

10 more documents belong here and are not on Voltaic: 5 drafts or notices on a draft, 3 drafts or notices on a draft not held as English text, 1 amendment not held as English text and 1 commencement notice or statement of reasons not held as English text.

Voltaic last read MERC's website for final documents on 24 Nov 2026 (8 pages) and for drafts on 24 Nov 2026. A document MERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on merc.gov.in ↗

Report an issue with this document