Skip to content

MERC · Maharashtra Electricity Regulatory Commission

Public Notice 09/2019-20 — Consultation on three draft Renewable Energy Regulations, 2019

Inviting Comments, suggestions and/or objections on three draft MERC Regulations pertaining to Renewable Energy

Public notice on a draftDated 26 Oct 2019Advertisement No. 09/2019-20 dated 26.10.2019

Draft

The draft has since been finalised as the Renewable Purchase Obligation and REC Framework Regulations, 2019.

Public notice on the Renewable Purchase Obligation and REC Framework Regulations, 2019 — Draft.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on merc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a one-page public notice by the Maharashtra Electricity Regulatory Commission announcing that it has prepared three draft regulations on renewable energy and inviting written comments, suggestions and objections on them (p1). A table names the three drafts and, for each, the earlier regulation it is proposed to supersede: Grid Interactive Roof-top Renewable Energy Generating Systems Regulations, 2019 (against the 2015 Net Metering for Roof-top Solar PV Regulations); RPO-REC Regulations, 2019 (against the 2016 RPO-REC Regulations); and RE Tariff Regulations, 2019 (against the 2015 RE Tariff Regulations) (p1).

The drafts and their Explanatory Memorandums are said to be downloadable from the Commission's website, and stakeholders must file comments separately for each draft, in two copies, to the Secretary, MERC, Mumbai, or by fax or e-mail (p1). Comments received on or before 18 November 2019 will be considered before the drafts are finalised (p1). The notice is dated 26.10.2019 (p1).

Standard name
RPO Regulations, REC Regulations, Net Metering and Rooftop Solar, Renewable Energy Tariff Regulations

Read with this

Commencement notices and reasons

Earlier drafts

10 more documents belong here and are not on Voltaic: 5 drafts or notices on a draft, 3 drafts or notices on a draft not held as English text, 1 amendment not held as English text and 1 commencement notice or statement of reasons not held as English text.

Voltaic last read MERC's website for final documents on 24 Nov 2026 (8 pages) and for drafts on 24 Nov 2026. A document MERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on merc.gov.in ↗

Report an issue with this document