MERC · Maharashtra Electricity Regulatory Commission
Explanatory Memorandum for Draft RPO-REC Regulations, 2019
EXPLANATORY MEMORANDUM ON DRAFT MAHARASHTRA ELECTRICITY REGULATORY COMMISSION (RENEWABLE PURCHASE OBLIGATION, ITS COMPLIANCE AND IMPLEMENTATION OF RENEWABLE ENERGY CERTIFICATE FRAMEWORK) REGULATIONS, 2019
Explanatory memorandum to a draftReleased with the notice dated 26 Oct 2019
Draft
The draft has since been finalised as the Renewable Purchase Obligation and REC Framework Regulations, 2019.
Explanatory memorandum to the Renewable Purchase Obligation and REC Framework Regulations, 2019 — Draft.
Summary
Summary written by software. Check the regulator's original before you rely on it.
The document is MERC's explanatory memorandum, dated October 2019, for the draft RPO-REC Regulations 2019, published for public consultation ahead of a new five-year control period beginning 1 April 2020 (p1, p8, p14). It is not the draft regulation itself: it explains why the Commission proposes changes to the 2016 RPO-REC framework and reproduces proposed clauses only where a change is proposed; unchanged clauses are not discussed (p8).
Part 1 traces the regulatory background from the 2004 RPO recognition and 2006 RPS order through the 2010 and 2016 regulations, and reviews Maharashtra's RE potential and DISCOM RPO compliance (p3–8). Part 2 explains proposed definitional changes, including deleting floor/forbearance price and replacing preferential tariff with generic tariff (p9). Part 3 sets out the proposed scope, including excluding consumption met from hydro power from the RPO base (p10–11).
Part 4 is the core: it proposes eligible RE sources (grid-connected and limited off-grid generation), restores the 1 MW/1 MVA threshold for open access and captive obligated entities, fixes the operating period to align with the MYT control period, explains the RPO trajectory for solar and non-solar, allows limited crossover between categories, recognises competitive-bid procurement and RECs, and proposes incentive/penalty mechanics with an RPO Fund (p12–22). Part 5 proposes a web-based RPO monitoring portal, monthly reporting and verification timelines, quarterly compliance publication, annual documentary verification, and State Agency collection of penalties, with Section 142 action for non-compliance (p23–25).
Read with this
The regulation
- Dated 27 Dec 2019Renewable Purchase Obligation and REC Framework Regulations, 2019
Amendments and corrections
Commencement notices and reasons
- Dated 27 Dec 2019RPO-REC Regulations, 2019 — Statement of Reasons
- Dated 23 Feb 2024RPO and REC Framework Regulations, 2019 — First Amendment, 2024 — Statement of Reasons
Earlier drafts
- Released with the notice dated 26 Oct 2019Renewable Purchase Obligation and REC Framework Regulations, 2019 — Draft
- Dated 26 Oct 2019Public notice: Public Notice 09/2019-20 — Consultation on three draft Renewable Energy Regulations, 2019
10 more documents belong here and are not on Voltaic: 5 drafts or notices on a draft, 3 drafts or notices on a draft not held as English text, 1 amendment not held as English text and 1 commencement notice or statement of reasons not held as English text.
Voltaic last read MERC's website for final documents on 24 Nov 2026 (8 pages) and for drafts on 24 Nov 2026. A document MERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.