Renewable Purchase Obligation, its Compliance and REC Framework (First Amendment) Regulations, 2024
Maharashtra Electricity Regulatory Commission (Renewable Purchase Obligation, its Compliance and Implementation of Renewable Energy Certificate Framework) (First Amendment) Regulations, 2024
AmendmentDated 23 Feb 2024No. MERC/Tech/Regulation/0133 dated 23rd February 2024
Amends the Renewable Purchase Obligation and REC Framework Regulations, 2019.
Summary
Summary written by software. Check the regulator's original before you rely on it.
The First Amendment to MERC's 2019 RPO/REC Regulations rewrites the renewable purchase obligation framework so that it runs through to 2029-30 (p8–10). It is made under sections 61 and 86(3) read with section 181 of the Electricity Act 2003 and Clause 5.3 of the Tariff Policy 2016, and the preamble explains that it folds in the Ministry of Power's RPO and Energy Storage Obligation trajectory order, the Green Energy Open Access Rules 2022 and the MoP's 20 October 2023 notification under the Energy Conservation Act (p8).
It first splits RPO into four newly defined categories — Wind RPO, Hydro Purchase Obligation, Distributed RPO (projects under 10 MW in any metering configuration) and Other RPO — and amends the list of eligible sources to add large hydro and pumped storage, small/mini/micro hydro, green hydrogen and green ammonia, and distributed RE systems below 10 MW (p9). It also sets out how HPO may be met, including from free power and, with Central Government approval, imported hydro (p9–10).
The operating period is replaced so that the framework runs from 1 April 2020 to 31 March 2030 (p10). The FY 2024-25 targets under Regulation 7.1 are deleted and replaced by a new Regulation 7.5(A) table of annual percentages for each category and a composite total for FY 2024-25 to FY 2029-30, with provisos allowing Wind RPO and HPO shortfalls to be swapped and allowing three classes of small obligated entity to meet only the composite target (p10–11). Incentives for over-compliance by all obligated entities are introduced (p11).
Regulation 7.6 is replaced with a menu of compliance routes — own generation, open access, requisitioning green energy from the licensee in 25% steps up to 100%, captive generation, RECs, and green hydrogen or green ammonia (p11–12). A new Regulation 7.7 creates an Energy Storage Obligation with an annual trajectory, a minimum renewable-energy content condition, and periodic review (p12–13). Regulation 8's proviso on meeting RPO through certificates is substituted (p13), and Regulations 12.1–12.3 are replaced with an incentive for licensees exceeding the Commission's minimum up to the Central Government target and an ARR reduction or penalty for cumulative shortfalls, with no carry-forward after FY 2023-24 (p13–14).
Read with this
The regulation
- Dated 27 Dec 2019Renewable Purchase Obligation and REC Framework Regulations, 2019
Commencement notices and reasons
- Dated 27 Dec 2019RPO-REC Regulations, 2019 — Statement of Reasons
- Dated 23 Feb 2024RPO and REC Framework Regulations, 2019 — First Amendment, 2024 — Statement of Reasons
Earlier drafts
- Released with the notice dated 26 Oct 2019Renewable Purchase Obligation and REC Framework Regulations, 2019 — Draft
- Released with the notice dated 26 Oct 2019Explanatory memorandum: Explanatory Memorandum for Draft RPO-REC Regulations, 2019
- Dated 26 Oct 2019Public notice: Public Notice 09/2019-20 — Consultation on three draft Renewable Energy Regulations, 2019
10 more documents belong here and are not on Voltaic: 5 drafts or notices on a draft, 3 drafts or notices on a draft not held as English text, 1 amendment not held as English text and 1 commencement notice or statement of reasons not held as English text.
Voltaic last read MERC's website for final documents on 24 Nov 2026 (8 pages) and for drafts on 24 Nov 2026. A document MERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.