MERC · Maharashtra Electricity Regulatory Commission
Renewable Purchase Obligation and REC Framework Regulations, 2019 — Draft
Maharashtra Electricity Regulatory Commission (Renewable Purchase Obligation, its Compliance and Implementation of Renewable Energy Certificate Framework) Regulations, 2019
Draft regulationReleased with the notice dated 26 Oct 2019
Draft
A proposal that has since been finalised as the Renewable Purchase Obligation and REC Framework Regulations, 2019.
Summary
Summary written by software. Check the regulator's original before you rely on it.
The document is a Maharashtra Electricity Regulatory Commission regulation establishing the state's renewable purchase obligation (RPO) and its link to the Central renewable energy certificate (REC) framework. It is made under the Electricity Act, 2003 and extends to the whole of Maharashtra; it is to commence on Gazette publication, though no Gazette date is printed (p1).
After definitions (pp1–3), Part A fixes the scope: RPO applies where the Commission specifies a renewable procurement percentage on total consumption within a distribution licensee's area, excluding hydro consumption (p3). Part B is the core. Regulation 4 lists eligible renewable sources, including non-fossil cogeneration, wind, biomass, small/mini/micro hydro, waste-to-energy, solar and approved hybrids, and allows generation with suitable metering; RECs can be used for compliance (p4). Regulation 5 makes the RPO apply to distribution licensees, captive users of grid-connected fossil-fuel captive plants of 1 MW and above, and open access consumers with contract demand of not less than 1 MVA, subject to conditions; standby/emergency captive facilities are excluded (p4–5).
Regulations 6 and 7 set a five-year operating period from 1 April 2020 to 31 March 2025 and annual solar, non-solar and composite RPO targets for each year, with limited flexibility to interchange surplus solar and non-solar energy and to carry forward small shortfalls (p5–6). Certificates issued under the CERC REC Regulations 2010 are valid, with solar and non-solar RECs tied to the corresponding obligation (p6–7).
Regulations 9–13 set the State Agency's role (MEDA or a designate), distribution licensee planning and reporting, captive/open access reporting, incentive and penalty mechanisms, an RPO Fund, and a web-portal monitoring framework with monthly reporting and verification deadlines (p7–10). Part C covers evacuation infrastructure beyond the inter-connection point and the Commission's powers to relax, issue directions, amend and remove difficulties (p10–11).
Read with this
The regulation
- Dated 27 Dec 2019Renewable Purchase Obligation and REC Framework Regulations, 2019
Amendments and corrections
Commencement notices and reasons
- Dated 27 Dec 2019RPO-REC Regulations, 2019 — Statement of Reasons
- Dated 23 Feb 2024RPO and REC Framework Regulations, 2019 — First Amendment, 2024 — Statement of Reasons
Earlier drafts
- Released with the notice dated 26 Oct 2019Explanatory memorandum: Explanatory Memorandum for Draft RPO-REC Regulations, 2019
- Dated 26 Oct 2019Public notice: Public Notice 09/2019-20 — Consultation on three draft Renewable Energy Regulations, 2019
10 more documents belong here and are not on Voltaic: 5 drafts or notices on a draft, 3 drafts or notices on a draft not held as English text, 1 amendment not held as English text and 1 commencement notice or statement of reasons not held as English text.
Voltaic last read MERC's website for final documents on 24 Nov 2026 (8 pages) and for drafts on 24 Nov 2026. A document MERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.