Skip to content

MERC · Maharashtra Electricity Regulatory Commission

Renewable Purchase Obligation and REC Framework Regulations, 2019 — Draft

Maharashtra Electricity Regulatory Commission (Renewable Purchase Obligation, its Compliance and Implementation of Renewable Energy Certificate Framework) Regulations, 2019

Draft regulationReleased with the notice dated 26 Oct 2019

Draft

A proposal that has since been finalised as the Renewable Purchase Obligation and REC Framework Regulations, 2019.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on merc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The document is a Maharashtra Electricity Regulatory Commission regulation establishing the state's renewable purchase obligation (RPO) and its link to the Central renewable energy certificate (REC) framework. It is made under the Electricity Act, 2003 and extends to the whole of Maharashtra; it is to commence on Gazette publication, though no Gazette date is printed (p1).

After definitions (pp1–3), Part A fixes the scope: RPO applies where the Commission specifies a renewable procurement percentage on total consumption within a distribution licensee's area, excluding hydro consumption (p3). Part B is the core. Regulation 4 lists eligible renewable sources, including non-fossil cogeneration, wind, biomass, small/mini/micro hydro, waste-to-energy, solar and approved hybrids, and allows generation with suitable metering; RECs can be used for compliance (p4). Regulation 5 makes the RPO apply to distribution licensees, captive users of grid-connected fossil-fuel captive plants of 1 MW and above, and open access consumers with contract demand of not less than 1 MVA, subject to conditions; standby/emergency captive facilities are excluded (p4–5).

Regulations 6 and 7 set a five-year operating period from 1 April 2020 to 31 March 2025 and annual solar, non-solar and composite RPO targets for each year, with limited flexibility to interchange surplus solar and non-solar energy and to carry forward small shortfalls (p5–6). Certificates issued under the CERC REC Regulations 2010 are valid, with solar and non-solar RECs tied to the corresponding obligation (p6–7).

Regulations 9–13 set the State Agency's role (MEDA or a designate), distribution licensee planning and reporting, captive/open access reporting, incentive and penalty mechanisms, an RPO Fund, and a web-portal monitoring framework with monthly reporting and verification deadlines (p7–10). Part C covers evacuation infrastructure beyond the inter-connection point and the Commission's powers to relax, issue directions, amend and remove difficulties (p10–11).

Standard name
RPO Regulations, REC Regulations
Primary topics
Renewable purchase obligation (RPO / RCO), Renewable energy certificates (REC), Network planning and investment

Read with this

Commencement notices and reasons

Earlier drafts

10 more documents belong here and are not on Voltaic: 5 drafts or notices on a draft, 3 drafts or notices on a draft not held as English text, 1 amendment not held as English text and 1 commencement notice or statement of reasons not held as English text.

Voltaic last read MERC's website for final documents on 24 Nov 2026 (8 pages) and for drafts on 24 Nov 2026. A document MERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on merc.gov.in ↗

Report an issue with this document