Summary written by software. Check the regulator's original before you rely on it.
This is a single-issue order from the Chhattisgarh State Electricity Regulatory Commission, made under the Supply Code's own removal-of-difficulties clause (para 13.21), to fix a mismatch created when the Third Amendment to the Supply Code (notified 20.03.2023) changed para 4.53 on electrification of underdeveloped / declared illegal colonies without aligning the associated illustration, Annexure 13A (p1). The order comes into force from its date of issuance, 12/01/2026, and says the corrected Annexure is not inconsistent with the Supply Code and its amendments (p1).
Operationally, the order states how Annexure 13A is henceforth to be read, as a worked illustration for supply in underdeveloped colonies (p2–3). It walks through the sequence a distribution licensee follows: receipt of new domestic connection applications, verification with the Municipal Corporation or local body that the area is an under-developed / declared illegal colony, assessment of load and estimation of external electrification cost, and publication of the resulting per-kW cost in a newspaper (p2). Load assessment is tied back to para 4.51's residential-colony norm (p2).
The illustration then fixes cost sharing: consumer contribution is capped per kW — ₹5,000 per kW in the example — with a total collectable amount from the applicants, and a minimum 25% of the estimated cost required before work starts. Any shortfall is to be met from MLA Fund, government schemes, DMF or Panchayat funds, while the remaining 75% is contributed by the licensee from its Normal Development Fund under the Capital Investment Plan (p2–3). Subsequent consumers connecting in the same colony pay the same per-kW rate, regardless of earlier cost estimates (p3).
The order is signed by the Commission's Secretary and contains no repeal, sunset or savings clause; it does not restate the Supply Code itself, only the illustration attached to para 4.53.
Read with this
The regulation
- Dated 28 Nov 2011Chhattisgarh State Electricity Supply Code, 2011
Amendments and corrections
- Dated 1 Jan 2014Chhattisgarh State Electricity Supply Code, 2011 — First Amendment, 2013
- Dated 6 Apr 2018Chhattisgarh State Electricity Supply Code, 2011 — Second Amendment, 2018
- Dated 13 Mar 2023Electricity Supply Code, Third Amendment, 2023
- Dated 29 Jul 2024Chhattisgarh State Electricity Supply Code — Fourth Amendment, 2024
- Dated 5 Dec 2024Chhattisgarh State Electricity Supply Code (Fourth Amendment) 2024 — Corrigendum
- Dated 22 Aug 2025Chhattisgarh State Electricity Supply Code, 2011 — Fifth Amendment, 2025
Procedures and orders made under it
- Dated 29 Jul 2026Supply Code (Removal of Difficulties) Second Order, 2026
7 more documents belong here and are not on Voltaic: 7 copies in another language.
Voltaic last read CSERC's website for final documents on 24 Nov 2026 and for drafts on 21 Nov 2026. A document CSERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.