CSERC · Chhattisgarh State Electricity Regulatory Commission

Chhattisgarh State Electricity Supply Code (Removal of Difficulties) First Order, 2026

Chhattisgarh State Electricity Supply Code (Removal of Difficulties), First Order, 2026

OrderDated 12 Jan 2026No. 04/S.C. (3rd Amdt.)/2026/65 dated 12/01/2026

Made under the Chhattisgarh State Electricity Supply Code, 2011.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cserc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a single-issue order from the Chhattisgarh State Electricity Regulatory Commission, made under the Supply Code's own removal-of-difficulties clause (para 13.21), to fix a mismatch created when the Third Amendment to the Supply Code (notified 20.03.2023) changed para 4.53 on electrification of underdeveloped / declared illegal colonies without aligning the associated illustration, Annexure 13A (p1). The order comes into force from its date of issuance, 12/01/2026, and says the corrected Annexure is not inconsistent with the Supply Code and its amendments (p1).

Operationally, the order states how Annexure 13A is henceforth to be read, as a worked illustration for supply in underdeveloped colonies (p2–3). It walks through the sequence a distribution licensee follows: receipt of new domestic connection applications, verification with the Municipal Corporation or local body that the area is an under-developed / declared illegal colony, assessment of load and estimation of external electrification cost, and publication of the resulting per-kW cost in a newspaper (p2). Load assessment is tied back to para 4.51's residential-colony norm (p2).

The illustration then fixes cost sharing: consumer contribution is capped per kW — ₹5,000 per kW in the example — with a total collectable amount from the applicants, and a minimum 25% of the estimated cost required before work starts. Any shortfall is to be met from MLA Fund, government schemes, DMF or Panchayat funds, while the remaining 75% is contributed by the licensee from its Normal Development Fund under the Capital Investment Plan (p2–3). Subsequent consumers connecting in the same colony pay the same per-kW rate, regardless of earlier cost estimates (p3).

The order is signed by the Commission's Secretary and contains no repeal, sunset or savings clause; it does not restate the Supply Code itself, only the illustration attached to para 4.53.

Standard name
Electricity Supply Code
Primary topics
New connections and load changes, Connection and miscellaneous charges

Read with this

Voltaic last read CSERC's website for final documents on 24 Nov 2026 and for drafts on 21 Nov 2026. A document CSERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cserc.gov.in ↗

Report an issue with this document