Chhattisgarh State Electricity Supply Code, 2011 — Fifth Amendment, 2025

Chhattisgarh State Electricity Supply Code (Fifth Amendment) 2025

AmendmentDated 22 Aug 2025No. 112/CSERC/2025 dated 22nd August 2025

Amends the Chhattisgarh State Electricity Supply Code, 2011.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cserc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is CSERC's Fifth Amendment to the Chhattisgarh State Electricity Supply Code 2011, issued at Raipur on 22 August 2025 under notification No. 112/CSERC/2025 (p1, p3). It is a short six-clause amendment, framed to incorporate changes the Ministry of Power, Government of India, identified for "Ease of Living" (p3).

Clause 1 gives the short title, the commencement rule (in force from the date of publication in the official Gazette, which is not printed), the territorial extent (whole of Chhattisgarh) and the rule that undefined expressions carry their meaning from the 2011 principal Code (p3).

Clause 2 substitutes Code 3.4 — itself earlier substituted by the third amendment — with a voltage-wise table of minimum and maximum contract demand running from 230 V up to 220 kV (p3).

Clause 3 inserts a new Code 4.1(e) after Code 4.1(d), creating a special route for consumers installing rooftop solar PV of capacity not exceeding 10 kW: no technical feasibility study is carried out, the contract demand is deemed enhanced where the solar capacity exceeds it, the consumer bears charges and deposits additional security, and a 5 kW single-phase consumer wanting up to 10 kW of rooftop solar must convert to three-phase, with automatic load enhancement capped until conversion (p3–4).

Clause 4 adds a further proviso to Code 4.20(ii) letting any consumer other than a domestic consumer take a separate LT/HT connection, with its own metering, in the same premises for EV charging or an EV charging station (p4). Clause 5 replaces "112 kW" with "150 kW" in Code 4.52(i) (p4). Clause 6 substitutes Code 7.16(i), permitting changeover to LT up to a 150 kW connected load (p4).

It is signed by the Secretary of the Commission (p4).

Standard name
Electricity Supply Code
Primary topics
Conditions of supply, New connections and load changes

Read with this

Voltaic last read CSERC's website for final documents on 24 Nov 2026 and for drafts on 21 Nov 2026. A document CSERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cserc.gov.in ↗

Report an issue with this document