CSERC · Chhattisgarh State Electricity Regulatory Commission
Chhattisgarh State Electricity Supply Code, 2011 — Second Amendment, 2018
Chhattisgarh State Electricity Supply Code (Second Amendment) 2018
AmendmentDated 6 Apr 2018No. 79/CSERC/2018
Amends the Chhattisgarh State Electricity Supply Code, 2011.
Summary
Summary written by software. Check the regulator's original before you rely on it.
Notification No. 79/CSERC/2018 is the Chhattisgarh State Electricity Regulatory Commission's second batch of amendments to the Chhattisgarh State Electricity Supply Code, 2011. It is made under Section 50 read with Section 181 of the Electricity Act, 2003 and comes into force from the date of publication in the official Gazette (p2).
The opening clauses (pp2–3) rebuild the Code's institutional machinery: a standing Electricity Supply Code Review Committee, chaired ex-officio by CSPDCL's Executive Director/Chief Engineer (O&M), with the CSPTCL (STU) as a member, one representative of other distribution licensees and consumer/association representatives, is to review the Supply Code together with the consumer grievance regulations at regular intervals, with a two-year tenure for the nominated and consumer members, and a Member Secretary appointed by the Chairperson.
The next block (pp2–4) recasts definitions and connection economics. Connected load, rural areas and urban areas are redefined and three new terms — normal connection, extension cases and supply affording charge — are inserted. The voltage-wise minimum/maximum contract demand table is republished with a licensee relaxation power subject to Commission approval, metering of LT connections above 100 HP on the HT side, and additional charges for consumers exceeding the maximum limit. Cost of extension and augmentation is tied to the Commission-approved Miscellaneous and General Charges, with supply affording charge recoverable from all categories except agriculture.
Clauses 11–13 (pp4–5) replace the new-connection paperwork: document lists per purpose (DLF/BPL, non-DLF, agriculture, industrial, public utility), a long list of acceptable identity proofs, a registration-cum-processing fee that is non-refundable but adjusted in future bills, and deletion of the old Regulation 4.17.
Pages 5–8 set load assessment and multi-consumer complex rules: area-based light-and-fan load norms for residential and non-residential buildings and plots graded by municipal body; special conditions for complexes at or above 50 kW, dedicated transformer capacity, developers bearing external electrification cost, land to be handed to the licensee for substations at a token premium, and case-by-case Commission decisions above 10,000 kW. Street-light fixtures, timer settings and maintenance duties are also revised.
Pages 8–13 deal with service delivery and the consumer relationship: time limits for completing extension works after payment and releasing load; temporary supply initially capped at two years with a seven-day extension window; security deposit tables by category and by number of consumption days, HT instalment payment and a 15-day billing option that is forfeited permanently on one default; interest on deposits at the RBI Bank Rate, computed each April and adjusted in May bills; rules on reduction and restoration of contract demand and on agreement renewal, termination notices and deemed sanction; permanent disconnection, recovery of old dues through the 1961 Dues Recovery Act, and reduced-load billing where a consumer never avails supply; and the revised theft-of-energy assessment formula with category-wise working days, hours and load factors, plus a separate formula for temporary connections.
The final clause (p14) adds provisions for CGPs/IPPs building dedicated HT/EHT lines and for licensee use or cost-sharing of their idle bays and lines.
Read with this
The regulation
- Dated 28 Nov 2011Chhattisgarh State Electricity Supply Code, 2011
Amendments and corrections
- Dated 1 Jan 2014Chhattisgarh State Electricity Supply Code, 2011 — First Amendment, 2013
- Dated 13 Mar 2023Electricity Supply Code, Third Amendment, 2023
- Dated 29 Jul 2024Chhattisgarh State Electricity Supply Code — Fourth Amendment, 2024
- Dated 5 Dec 2024Chhattisgarh State Electricity Supply Code (Fourth Amendment) 2024 — Corrigendum
- Dated 22 Aug 2025Chhattisgarh State Electricity Supply Code, 2011 — Fifth Amendment, 2025
Procedures and orders made under it
7 more documents belong here and are not on Voltaic: 7 copies in another language.
Voltaic last read CSERC's website for final documents on 24 Nov 2026 and for drafts on 21 Nov 2026. A document CSERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.