Summary
Summary written by software. Check the regulator's original before you rely on it.
The Chhattisgarh State Electricity Regulatory Commission's Notification No. 54/CSERC/2013 amends the Chhattisgarh State Electricity Supply Code, 2011. It recites that difficulties in implementation, stakeholder submissions and the Supply Code Review Committee constituted under clause 1.6 of the Code made amendments necessary, and it exercises the amendment power in clause 1.10. The amending instrument is to be cited as the Chhattisgarh State Electricity Supply Code (First Amendment) 2013 and came into force on 1 January 2014 (p1).
Clause 2 rewrites the voltage-wise band of minimum and maximum contract demand for supply from 230 volts to 220 kV, allows the Commission to relax it on a licensee's request for technical reasons, and provides for additional charges on HT/EHT consumers whose contract demand exceeds the prescribed maximum (p2). Clause 3 replaces the HT/EHT application process, adding joint inspection with the transmission licensee, feasibility and demand-note timelines, and expressly preserving the schedule in clause 4.58 (p2).
Clauses 4 and 5 handle LT load assessment and multi-consumer complexes: area-based load norms by local-body class and use, the definition of a multi-consumer complex, dedicated distribution transformer requirements, who bears external electrification and system-strengthening costs, land to be given at token premium for licensee-built 33/11 kV substations, and case-by-case referral to the Commission for the largest loads (p3–6). Clause 6 gives special connection terms for small/cottage industries up to 25 HP, except stone crushers, with interim per-HP charges pending approval of miscellaneous and general charges (p6).
Clauses 7 to 10 rebuild the security deposit regime — the days-of-consumption basis, annual October review, adjustment against bills, refund and interest, and treatment of additional load (p6–7). Clauses 11 to 17 cover contract demand and phasing, release of enhanced load, reduction of load/contract demand with grievance routes, agreement formalities on HT/LT conversion, and change of tariff category (p7–9). Clause 18 prescribes the theft-assessment methodology (load, period, hours, load factor by category) (p9–10); clause 19 sets the conditions for a consumer-side power plant running in parallel with, or isolated from, the licensee's system (p10–11); and clause 20 corrects a cross-reference in clause 13.20 to the Supply Code, 2005 (p11).
Read with this
The regulation
- Dated 28 Nov 2011Chhattisgarh State Electricity Supply Code, 2011
Amendments and corrections
- Dated 6 Apr 2018Chhattisgarh State Electricity Supply Code, 2011 — Second Amendment, 2018
- Dated 13 Mar 2023Electricity Supply Code, Third Amendment, 2023
- Dated 29 Jul 2024Chhattisgarh State Electricity Supply Code — Fourth Amendment, 2024
- Dated 5 Dec 2024Chhattisgarh State Electricity Supply Code (Fourth Amendment) 2024 — Corrigendum
- Dated 22 Aug 2025Chhattisgarh State Electricity Supply Code, 2011 — Fifth Amendment, 2025
Procedures and orders made under it
7 more documents belong here and are not on Voltaic: 7 copies in another language.
Voltaic last read CSERC's website for final documents on 24 Nov 2026 and for drafts on 21 Nov 2026. A document CSERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.