Chhattisgarh State Electricity Supply Code, 2011 — First Amendment, 2013

Chhattisgarh State Electricity Supply Code (First Amendment) 2013

AmendmentDated 1 Jan 2014In force from 1 Jan 2014No. 54/CSERC/2013 dated 1st January, 2014

Amends the Chhattisgarh State Electricity Supply Code, 2011.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cserc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The Chhattisgarh State Electricity Regulatory Commission's Notification No. 54/CSERC/2013 amends the Chhattisgarh State Electricity Supply Code, 2011. It recites that difficulties in implementation, stakeholder submissions and the Supply Code Review Committee constituted under clause 1.6 of the Code made amendments necessary, and it exercises the amendment power in clause 1.10. The amending instrument is to be cited as the Chhattisgarh State Electricity Supply Code (First Amendment) 2013 and came into force on 1 January 2014 (p1).

Clause 2 rewrites the voltage-wise band of minimum and maximum contract demand for supply from 230 volts to 220 kV, allows the Commission to relax it on a licensee's request for technical reasons, and provides for additional charges on HT/EHT consumers whose contract demand exceeds the prescribed maximum (p2). Clause 3 replaces the HT/EHT application process, adding joint inspection with the transmission licensee, feasibility and demand-note timelines, and expressly preserving the schedule in clause 4.58 (p2).

Clauses 4 and 5 handle LT load assessment and multi-consumer complexes: area-based load norms by local-body class and use, the definition of a multi-consumer complex, dedicated distribution transformer requirements, who bears external electrification and system-strengthening costs, land to be given at token premium for licensee-built 33/11 kV substations, and case-by-case referral to the Commission for the largest loads (p3–6). Clause 6 gives special connection terms for small/cottage industries up to 25 HP, except stone crushers, with interim per-HP charges pending approval of miscellaneous and general charges (p6).

Clauses 7 to 10 rebuild the security deposit regime — the days-of-consumption basis, annual October review, adjustment against bills, refund and interest, and treatment of additional load (p6–7). Clauses 11 to 17 cover contract demand and phasing, release of enhanced load, reduction of load/contract demand with grievance routes, agreement formalities on HT/LT conversion, and change of tariff category (p7–9). Clause 18 prescribes the theft-assessment methodology (load, period, hours, load factor by category) (p9–10); clause 19 sets the conditions for a consumer-side power plant running in parallel with, or isolated from, the licensee's system (p10–11); and clause 20 corrects a cross-reference in clause 13.20 to the Supply Code, 2005 (p11).

Standard name
Electricity Supply Code
Primary topics
Conditions of supply, New connections and load changes, Security deposit

Read with this

Voltaic last read CSERC's website for final documents on 24 Nov 2026 and for drafts on 21 Nov 2026. A document CSERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cserc.gov.in ↗

Report an issue with this document