Supply Code (Removal of Difficulties) Second Order, 2026

Chhattisgarh State Electricity Supply Code (Removal of Difficulties), Second Order, 2026

OrderDated 29 Jul 2026No. 04/S.C. (4 th Amdt.)/2026/1360 dated 29/07/2026

Made under the Chhattisgarh State Electricity Supply Code, 2011.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cserc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a Chhattisgarh State Electricity Regulatory Commission removal-of-difficulties order issued at Raipur on 29 July 2026 (p1). Its recitals trace the problem to two Supply Code amendments — the Second Amendment 2018 and the Fourth Amendment 2024 — which respectively prescribe the documents needed with a new-connection application and the procedure for grant of new service, and require that any agreement be built into the application form rather than executed separately (p1). The Commission also notes that consumers are now potential prosumers following the CSERC (Grid Interactive Distributed Renewable Energy Sources) Regulations 2019, and that difficulty has arisen in integrating net metering agreement terms with the initial application form for a new service connection (p1).

Clause 1 names the order and brings it into force from the date of issuance (p2). Clause 2 merges Annexure-1 and Annexure-3 of the Supply Code 2011 into a single application form — "Application for new service connection cum agreement cum Power Purchase Agreement (PPA)" — for all consumers in the domestic category (p2). Pages 2–7 set out that form in full: applicant and premises particulars, ownership or tenancy proof, GSTIN, connected load and line distance, meter choice, and a terms-and-conditions section covering supply at 230/415 V, monthly billing, security deposit, recovery of outstanding dues, meter protection and licensee access, and acceptance of the Electricity Act 2003, the Supply Code and CEA safety regulations. Clause 14(l) provides that if the consumer later applies for rooftop solar, the same agreement serves as a PPA, absorbing net metering billing with carry-forward and year-end settlement of surplus units, PM Surya Ghar Yojana, CEA technical standards, and ownership and maintenance obligations (p6).

Clause 3 replaces Annexure-5 with a combined load/demand increase–decrease application-cum-agreement-cum-PPA for domestic consumers, on parallel terms (pp11–15). Hindi versions of both forms follow the English text (pp7–10, 15–19), and the order is signed by the Deputy Secretary "By order of the Commission" (p19).

Standard name
Electricity Supply Code
Primary topics
New connections and load changes, Conditions of supply, Net metering

Read with this

Voltaic last read CSERC's website for final documents on 24 Nov 2026 and for drafts on 21 Nov 2026. A document CSERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cserc.gov.in ↗

Report an issue with this document