CSERC · Chhattisgarh State Electricity Regulatory Commission
Supply Code (Removal of Difficulties) Second Order, 2026
Chhattisgarh State Electricity Supply Code (Removal of Difficulties), Second Order, 2026
OrderDated 29 Jul 2026No. 04/S.C. (4 th Amdt.)/2026/1360 dated 29/07/2026
Made under the Chhattisgarh State Electricity Supply Code, 2011.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is a Chhattisgarh State Electricity Regulatory Commission removal-of-difficulties order issued at Raipur on 29 July 2026 (p1). Its recitals trace the problem to two Supply Code amendments — the Second Amendment 2018 and the Fourth Amendment 2024 — which respectively prescribe the documents needed with a new-connection application and the procedure for grant of new service, and require that any agreement be built into the application form rather than executed separately (p1). The Commission also notes that consumers are now potential prosumers following the CSERC (Grid Interactive Distributed Renewable Energy Sources) Regulations 2019, and that difficulty has arisen in integrating net metering agreement terms with the initial application form for a new service connection (p1).
Clause 1 names the order and brings it into force from the date of issuance (p2). Clause 2 merges Annexure-1 and Annexure-3 of the Supply Code 2011 into a single application form — "Application for new service connection cum agreement cum Power Purchase Agreement (PPA)" — for all consumers in the domestic category (p2). Pages 2–7 set out that form in full: applicant and premises particulars, ownership or tenancy proof, GSTIN, connected load and line distance, meter choice, and a terms-and-conditions section covering supply at 230/415 V, monthly billing, security deposit, recovery of outstanding dues, meter protection and licensee access, and acceptance of the Electricity Act 2003, the Supply Code and CEA safety regulations. Clause 14(l) provides that if the consumer later applies for rooftop solar, the same agreement serves as a PPA, absorbing net metering billing with carry-forward and year-end settlement of surplus units, PM Surya Ghar Yojana, CEA technical standards, and ownership and maintenance obligations (p6).
Clause 3 replaces Annexure-5 with a combined load/demand increase–decrease application-cum-agreement-cum-PPA for domestic consumers, on parallel terms (pp11–15). Hindi versions of both forms follow the English text (pp7–10, 15–19), and the order is signed by the Deputy Secretary "By order of the Commission" (p19).
Read with this
The regulation
- Dated 28 Nov 2011Chhattisgarh State Electricity Supply Code, 2011
Amendments and corrections
- Dated 1 Jan 2014Chhattisgarh State Electricity Supply Code, 2011 — First Amendment, 2013
- Dated 6 Apr 2018Chhattisgarh State Electricity Supply Code, 2011 — Second Amendment, 2018
- Dated 13 Mar 2023Electricity Supply Code, Third Amendment, 2023
- Dated 29 Jul 2024Chhattisgarh State Electricity Supply Code — Fourth Amendment, 2024
- Dated 5 Dec 2024Chhattisgarh State Electricity Supply Code (Fourth Amendment) 2024 — Corrigendum
- Dated 22 Aug 2025Chhattisgarh State Electricity Supply Code, 2011 — Fifth Amendment, 2025
Procedures and orders made under it
7 more documents belong here and are not on Voltaic: 7 copies in another language.
Voltaic last read CSERC's website for final documents on 24 Nov 2026 and for drafts on 21 Nov 2026. A document CSERC issued after the page that lists it was read may not be held by Voltaic yet.