Chhattisgarh State Electricity Supply Code — Fourth Amendment, 2024

Chhattisgarh State Electricity Supply Code (Fourth Amendment) 2024

AmendmentDated 29 Jul 2024In force from 1 Apr 2024No. 109/CSERC/2024 dated 29th July 2024

Amends the Chhattisgarh State Electricity Supply Code, 2011.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cserc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The Chhattisgarh State Electricity Regulatory Commission issued this notification on 29 July 2024 to make the Fourth Amendment to the Chhattisgarh State Electricity Supply Code-2011. Although notified in July, the amendment is expressed to come into force from 1 April 2024 and applies across Chhattisgarh (p2).

Part 1 (pp2–4) rewrites and adds definitions in Chapter 2 of the principal code: advance metering infrastructure, applicant, area of supply, consumer, prosumer, consumption charges, minimum charge, days, prepaid/prepayment meter, disconnection, security deposit, smart meter and tariff. It also replaces the consumer data-protection and interpretation clause, tying licensee obligations to CEA guidelines and the Information Technology Act 2000 (p4).

Part 2 (pp4–10) amends Chapter 4 on new connections. It requires distribution licensees to publish procedures, forms, contacts and charges on websites and notice boards; provide online application and tracking; and accept hard-copy or electronic applications. It fixes consequences for delayed supply, fixed connection charges for connections up to 150 kW in electrified areas, rules for single-point versus individual connections in residential associations, and a separate connection for EV charging. It replaces clauses on service-line specifications, notice periods for availing supply, demand notes, extension timelines, consumer-executed line work and inspection. It adds a framework for supply through prepaid smart meters, including an SOP to be submitted to the Commission within one month, and replaces the schedule of time limits for new connections and load increases (pp9–10).

Part 3 (pp10–12) deals with security deposits and arrears. It bars security deposits for new prepaid smart meter connections, credits existing deposits, and adds an arrear adjustment methodology for prepaid consumers—adjustment against SD, instalment recovery, notice before revised billing, refund/adjustment and surcharge conditions.

Part 4 (pp12–14) amends metering and billing. It substitutes meter ownership/testing rules, adds no-penalty protection for pre-installation maximum demand, and adds detailed operational requirements for prepaid smart meters: availability, IS certification, recharge modes, communication, TOD/kVAh registers, daily charge deduction, estimated billing on non-communication, low-balance alerts, auto-reconnection, software tariff implementation, check-meter installation and cost recovery. It also adds rules for damage/replacement, remote reading and prepaid billing.

Part 5 (pp15–16) amends disconnection and permanent disconnection rules for prepaid smart meters, including timing of disconnection, notification, restoration and permanent removal. Finally, it adds a clause empowering the Commission to regulate, monitor, inspect and penalise prepaid smart meter implementation (p16).

Standard name
Electricity Supply Code
Primary topics
New connections and load changes, Metering, Billing and payment

Read with this

Voltaic last read CSERC's website for final documents on 24 Nov 2026 and for drafts on 21 Nov 2026. A document CSERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cserc.gov.in ↗