Skip to content

CERC · Central Electricity Regulatory Commission

Power Market Regulations, 2010 — Second Amendment, 2019

Central Electricity Regulatory Commission (Power Market) (Second Amendment) Regulations, 2019

Amendment · Gazette copyDated 12 Dec 2019Published in the Gazette 27 Dec 2019No. L-1/13/2010/CERC dated 12th December, 2019

Replaced by Power Market Regulations, 2021

See that regulation for the date it took effect and for anything it keeps in force.

The Gazette copy of the Power Market Regulations, 2010 — Second Amendment, 2019.

Saving clause of the regulation that replaces it: “Notwithstanding such repeal: (a) anything done or any action taken or purported to have been done or taken or any registration or permission granted or any document or instrument executed or any direction given under the repealed regulations shall, in so far as it is not inconsistent with the provisions of these regulations, be deemed to have been done or taken under the corresponding provisions of these regulations.”

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the Central Electricity Regulatory Commission's second amendment to its Power Market Regulations, 2010, notified on 12 December 2019 (p3) and gazetted on 27 December 2019 (p1). Its operative content is almost entirely definitional.

Clause 2 inserts new definitions into Regulation 2 of the Principal Regulations — Collective Transaction and Continuous Transaction, Day Ahead Market, Gate Closure in the real-time market context, and Real-time Contract and Real-Time Market — and substitutes the existing Intraday Contract/Contingency Contract definition with a revised one that carves out the real-time market delivery window (p3). Together these introduce the vocabulary of a real-time power exchange market alongside the existing day-ahead framework.

Clause 3 amends Regulation 4 of the Principal Regulations. Clause 4 amends Regulation 11 so that both its heading and Clause A(ii) are extended from day-ahead markets to real-time markets (p4). Commencement is deferred to 1 April 2020, or such other date as the Commission may notify (p3).

A closing Note records the gazette history of the Principal Regulations and of prior amendments.

Standard name
Power Market Regulations
Primary topics
Power markets and exchanges

Read with this

The regulation

Commencement notices and reasons

Other copies of these documents (2)

Proposed changes (drafts with no final yet)

Earlier drafts

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document