Skip to content

CERC · Central Electricity Regulatory Commission

Power Market Regulations, 2010

Central Electricity Regulatory Commission (Power Market) Regulations, 2010

Regulation · Gazette copyDated 20 Jan 2010No. L-1/13/2010-CERC dated 20th January, 2010

Replaced by Power Market Regulations, 2021

See that regulation for the date it took effect and for anything it keeps in force.

The Gazette copy of the Power Market Regulations, 2010.

Saving clause of the regulation that replaces it: “Notwithstanding such repeal: (a) anything done or any action taken or purported to have been done or taken or any registration or permission granted or any document or instrument executed or any direction given under the repealed regulations shall, in so far as it is not inconsistent with the provisions of these regulations, be deemed to have been done or taken under the corresponding provisions of these regulations.”

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software, from pages 1 to 81 of 94. Check the regulator's original before you rely on it.

The document is the Central Electricity Regulatory Commission (Power Market) Regulations, 2010, notified on 20 January 2010 under s.66 read with s.178(2)(y) of the Electricity Act, 2003 and para 5.7.1(f) of the National Electricity Policy (p43). It comes into force from the date of publication in the Official Gazette, but the Gazette date is not printed (p43).

Part 1 (pp43–47) sets the short title and commencement and defines market, exchange, contract, clearing, risk and settlement terms, including Annual Turnover, Market Splitting, Other Exchanges, Power Exchange, Settlement Guarantee Fund and Term Ahead market. Part 2 (pp47–49) makes the regulations apply to OTC, Power Exchange and Other Exchange markets and to listed contract families: delivery-based short-term OTC contracts, OTC derivatives, exchange-traded intraday/day-ahead/term-ahead contracts, exchange-traded financial derivatives, REC-linked and other new contracts, capacity contracts and ancillary services contracts. It also binds grid-connected entities, traders, exchanges, clearing corporations, members and other transacting parties (p49).

Two unnumbered sections headed 'Approval / Suspension of the Contracts by the Commission' and 'Principles of Market and Market Design' (pp50–53) require exchange contracts to be permitted by the Commission unless already approved, set out contract-specification review parameters, bar derivatives, ancillary and capacity contracts until notified, and allow suspension or withdrawal after hearing. They state Power Exchange objectives and day-ahead market design — social-welfare price discovery, double-sided closed bidding, uniform clearing price, market splitting on congestion, regional-periphery delivery — as well as delivery coordination through SLDCs/NLDC, OTC market principles and the overriding requirement that market mechanisms not compromise grid security.

Part 5 (pp54–81) is the operational core. It makes registration mandatory for Power Exchanges, deems existing approved exchanges registered subject to annual charge, and requires realignment of bye-laws/rules within three months (p54). Regulations 15–23 deal with eligibility, application and public consultation, documents, prudential norms including networth and Settlement Guarantee Fund, shareholding limits and transitional compliance, grant and renewal of registration, governance and independent directors, and annual registration charges. Regulations 24–28 specify bye-law contents, senior management and committees, membership categories and restrictions, a cap on member service charges for day-ahead and term-ahead markets, and risk-management/margin requirements. Regulations 29–36 cover optional or mandatory clearing corporations, the default remedy waterfall, IT and audit requirements, delivery/scheduling under open-access and grid-code procedures, UI settlement for mismatches, congestion-amount handling, annual reporting, market-share closure/merger and the exit scheme.

For an analyst, the document matters because it is the framework instrument for India's power exchanges: it defines which contracts may be launched, how exchanges are registered and governed, how risk and defaults are handled, and how congestion and scheduling interact with open access and grid code.

Standard name
Power Market Regulations
Primary topics
Power markets and exchanges, Licensing and licence conditions, Energy accounting and settlement

Read with this

The regulation

Commencement notices and reasons

Other copies of these documents (2)

Proposed changes (drafts with no final yet)

Earlier drafts

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document