Skip to content

CERC · Central Electricity Regulatory Commission

Public Notice — Proposed Framework for Real-Time Market for Electricity

Proposed framework for Real-Time Market for Electricity

Hearing notice on a draftDated 30 Sep 2019No. RA-14026(11)/2/2018/CERC dated 30.09.2019

Draft

The draft has since been finalised as the Power Market Regulations, 2010 — Second Amendment, 2019.

Hearing notice on the Power Market (Second Amendment) Regulations, 2019 — Draft.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a one-page CERC public notice (No. RA-14026(11)/2/2018/CERC, dated 30.09.2019) announcing that the Commission has proposed a framework for a Real-Time Market for Electricity, to be brought in by amending enabling provisions in three existing regulations: the Indian Electricity Grid Code, 2010, the Power Market Regulations, 2010, and the Open Access in Inter-State Transmission Regulations, 2008 (p1).

The notice convenes a public hearing on the subject for 14.10.2019 at 02.30 PM, with the venue and invitee details set out in a table (p1). The Commission invites organisations to attend or depute an officer conversant with the subject, and asks that the names of proposed participants be communicated latest by 11.10.2019, along with an indication of whether a presentation will be made; presentations are to be short, limited in slide count and duration (p1).

The document contains no draft text of the amendments, no eligibility thresholds and no substantive obligations — it is purely a consultation and participation notice. Anyone tracking the introduction of the real-time market would read this for the procedural timetable rather than the content of the framework.

Read with this

The regulation

Commencement notices and reasons

Other copies of these documents (3)

Proposed changes (drafts with no final yet)

Earlier drafts

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document