CERC · Central Electricity Regulatory Commission
Power Market Regulations, 2010
Central Electricity Regulatory Commission (Power Market) Regulations, 2010
RegulationDated 20 Jan 2010No. L-1/13/2010- CERC dated 20th January, 2010
Replaced by Power Market Regulations, 2021
See that regulation for the date it took effect and for anything it keeps in force.
Saving clause of the regulation that replaces it: “Notwithstanding such repeal: (a) anything done or any action taken or purported to have been done or taken or any registration or permission granted or any document or instrument executed or any direction given under the repealed regulations shall, in so far as it is not inconsistent with the provisions of these regulations, be deemed to have been done or taken under the corresponding provisions of these regulations.”
Summary
Summary written by software, from pages 1 to 42 of 47. Check the regulator's original before you rely on it.
CERC's Power Market Regulations, 2010 (notification No. L-1/13/2010-CERC, dated 20 January 2010) create the framework for organised inter-State electricity markets. They are made under s.66 read with s.178(2)(y) of the Electricity Act, 2003 and para 5.7.1(f) of the National Electricity Policy, and come into force on Gazette publication (Gazette date not printed) (p1).
Part 1 defines the vocabulary of the market — exchange, clearing corporation, client, day-ahead, intraday and term-ahead contracts, derivatives, market splitting, open position, Settlement Guarantee Fund, net worth and the several risks (pp1–5). Part 2 sets the scope: OTC markets, Power Exchange markets and Other Exchange markets, the catalogue of deliverable and financially settled contracts, and the market participants covered, including grid-connected entities, traders, exchanges, clearing corporations, members and clients (pp6–8).
Regulations 6–9 require Commission permission before an exchange introduces contracts, prescribe what contract specifications the Commission examines, prohibit derivatives, ancillary services and capacity contracts unless separately notified, and allow suspension or withdrawal of a contract (pp9–10). Part 4 lays down market-design principles: fair price discovery, standardised contracts, a day-ahead double-sided closed-bid auction, uniform clearing price, market splitting for transmission congestion, delivery at regional periphery, and OTC suitability and disclosure duties (pp11–12).
Part 5 is the core Power Exchange regime: registration and eligibility; application, public notice and grant/renewal; minimum net worth and SGF prudential norms; shareholding caps; ownership and governance rules; annual registration charge; byelaw contents; senior management and committees; membership categories and client-service limits; member service charge ceiling; risk management and gross margining; hive-off of clearing to a Clearing Corporation; default remedy waterfall; IT and audit-trail requirements; delivery and scheduling through Open Access Regulations and IEGC; congestion-amount handling; annual reporting; market-share exit; exit scheme; withdrawal of registration and grievance redressal (pp13–33).
Part 6 sets the separate Clearing Corporation regime: permission, eligibility, novation, clearing and settlement, default remedy, electronic clearing system, transfer of SGF and credit rating (pp34–35). Part 7 gives the Commission market-oversight and intervention powers — investigation, interim orders, price floors and caps, cooling-off, margin and position limits — and imposes exchange information dissemination, surveillance analysis, transaction reporting, whistleblowing and insider-trading policies (pp36–42). Pp43–47 are not available.
Read with this
Amendments and corrections
- Dated 3 Apr 2014Power Market Regulations, 2010 — First Amendment, 2014
- Dated 12 Dec 2019Power Market Regulations, 2010 — Second Amendment, 2019
- Dated 20 Mar 2020Power Market (Second Amendment) Regulations, 2019 — Commencement Notification
Commencement notices and reasons
Procedures and orders made under it
Other copies of these documents (3)
- Dated 20 Jan 2010Power Market Regulations, 2010
- Dated 3 Apr 2014Power Market Regulations, 2010 — First Amendment, 2014
- Dated 12 Dec 2019Power Market Regulations, 2010 — Second Amendment, 2019
Proposed changes (drafts with no final yet)
Earlier drafts
- Dated 7 Jan 2014Power Market (First Amendment) Regulations, 2014 — Draft
- Released with the notice dated 7 Jan 2014Explanatory memorandum: Power Market (First Amendment) Regulations, 2014 — Explanatory Memorandum — Draft
- Dated 7 Jan 2014Public notice: Power Market Regulations, 2010 — First Amendment, 2014 — Public Notice — Draft
- Dated 6 Aug 2019Power Market (Second Amendment) Regulations, 2019 — Draft
- Released with the notice dated 6 Aug 2019Explanatory memorandum: Real-Time Markets for Electricity — Explanatory Memorandum
- Dated 6 Aug 2019Public notice: Proposed Real-Time Market framework — Public Notice, 2019
- Dated 30 Sep 2019Hearing notice: Public Notice — Proposed Framework for Real-Time Market for Electricity
Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.