Skip to content

CERC · Central Electricity Regulatory Commission

Real-Time Markets for Electricity — Explanatory Memorandum

Real-Time Markets for Electricity

Explanatory memorandum to a draftReleased with the notice dated 6 Aug 2019

Explanatory memorandum to the Open Access in inter-State Transmission Regulations, 2008 — Sixth Amendment, 2019 — Draft.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This CERC explanatory memorandum sets out why and how the Commission proposes to create a Real-Time Market (RTM) for electricity. It records that a discussion paper, 'Re-Designing the Real-Time Electricity Markets in India', was published on 25 July 2018 (p1); 21 stakeholders, including POSOCO, power exchanges, trading licensees, IPPs, state utilities, state LDCs, generators and consultancies, commented, with the list in Annexure-I (p2). Stakeholders broadly supported an RTM and renewable integration but raised implementation and interface concerns (p2).

The proposed RTM design in Section 2 is a half-hourly market, not the hourly market of the discussion paper, using a double-sided closed auction with uniform price, gate closure, buy/sell bids for each 15-minute block, and financially and physically binding outcomes (p2–3). Post-RTM failure to follow dispatch attracts DSM charges (p3).

Section 3 explains the proposed amendments. On gate closure and right to revision, revisions made in odd time blocks would take effect from the 7th block and even-block revisions from the 8th block, with revision permitted until RTM commences for a given half-hour (p3–5). The existing intra-day market would continue except for RTM time blocks (p6–7), and all grid-connected generators, including forced-outage generators buying for beneficiaries, could participate (p7). The operational timeline covers the market window, NLDC corridor assessment, exchange clearing, schedule communication and delivery for each half-hour (p7–11). On sharing and settlement, RTM is an energy-only market around variable cost, gains of long-term contracted generators are shared with beneficiaries as stipulated in the Tariff Policy, 2016, DSM prices are to be linked to RTM prices as already indicated in the 4th Amendment to DSM Regulations, and deviations are treated under existing DSM Regulations (p12–13). CERC lists the clauses proposed to be amended or added in the Power Market Regulations, 2010, IEGC Regulations, 2010 and Open Access in inter-state transmission Regulations, 2008 and solicits comments (p13).

Standard name
Power Market Regulations, Grid Code, Open Access Regulations
Primary topics
Power markets and exchanges, Scheduling and despatch, Grid operation and grid code

Read with this

Read with this: Open Access in inter-State Transmission Regulations, 2008

The regulation

Other copies of these documents (6)

2 more documents belong here and are not on Voltaic: 2 drafts or notices on a draft not held as English text.

It is also read with: Indian Electricity Grid Code Regulations, 2010

Draft · Explanatory memorandum to the Indian Electricity Grid Code, 2010 — Sixth Amendment, 2019 — Draft. The draft has since been finalised as the Indian Electricity Grid Code (Sixth Amendment) Regulations, 2019.

The regulation

Other copies of these documents (9)

3 more documents belong here and are not on Voltaic: 2 drafts or notices on a draft and 1 draft or notice on a draft not held as English text.

It is also read with: Power Market Regulations, 2010

Draft · Explanatory memorandum to the Power Market (Second Amendment) Regulations, 2019 — Draft. The draft has since been finalised as the Power Market Regulations, 2010 — Second Amendment, 2019.

The regulation

Commencement notices and reasons

Other copies of these documents (3)

Proposed changes (drafts with no final yet)

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document