CERC · Central Electricity Regulatory Commission
Real-Time Markets for Electricity — Explanatory Memorandum
Real-Time Markets for Electricity
Explanatory memorandum to a draftReleased with the notice dated 6 Aug 2019
Draft
The draft has since been finalised as the Open Access in inter-State Transmission (Sixth Amendment) Regulations, 2019.
Explanatory memorandum to the Open Access in inter-State Transmission Regulations, 2008 — Sixth Amendment, 2019 — Draft.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This CERC explanatory memorandum sets out why and how the Commission proposes to create a Real-Time Market (RTM) for electricity. It records that a discussion paper, 'Re-Designing the Real-Time Electricity Markets in India', was published on 25 July 2018 (p1); 21 stakeholders, including POSOCO, power exchanges, trading licensees, IPPs, state utilities, state LDCs, generators and consultancies, commented, with the list in Annexure-I (p2). Stakeholders broadly supported an RTM and renewable integration but raised implementation and interface concerns (p2).
The proposed RTM design in Section 2 is a half-hourly market, not the hourly market of the discussion paper, using a double-sided closed auction with uniform price, gate closure, buy/sell bids for each 15-minute block, and financially and physically binding outcomes (p2–3). Post-RTM failure to follow dispatch attracts DSM charges (p3).
Section 3 explains the proposed amendments. On gate closure and right to revision, revisions made in odd time blocks would take effect from the 7th block and even-block revisions from the 8th block, with revision permitted until RTM commences for a given half-hour (p3–5). The existing intra-day market would continue except for RTM time blocks (p6–7), and all grid-connected generators, including forced-outage generators buying for beneficiaries, could participate (p7). The operational timeline covers the market window, NLDC corridor assessment, exchange clearing, schedule communication and delivery for each half-hour (p7–11). On sharing and settlement, RTM is an energy-only market around variable cost, gains of long-term contracted generators are shared with beneficiaries as stipulated in the Tariff Policy, 2016, DSM prices are to be linked to RTM prices as already indicated in the 4th Amendment to DSM Regulations, and deviations are treated under existing DSM Regulations (p12–13). CERC lists the clauses proposed to be amended or added in the Power Market Regulations, 2010, IEGC Regulations, 2010 and Open Access in inter-state transmission Regulations, 2008 and solicits comments (p13).
Read with this
Read with this: Open Access in inter-State Transmission Regulations, 2008
The regulation
- Dated 25 Jan 2008Open Access in inter-State Transmission Regulations, 2008
Amendments and corrections
- Dated 20 May 2009Open Access in inter-State Transmission (Amendment) Regulations, 2009
- Dated 10 Jun 2009Open Access in inter-State Transmission Regulations, 2008 — Corrigendum, 2009
- Dated 10 Jun 2009Open Access (Amendment) Regulations, 2009 — Corrigenda
- Dated 11 Sep 2013Open Access in inter-State Transmission (Second Amendment) Regulations, 2013
- Dated 12 May 2015Open Access in inter-State Transmission (Third Amendment) Regulations, 2015
- Dated 22 Jun 2016Open Access in inter-State Transmission (Fourth Amendment) Regulations, 2016
- Dated 2 Jan 2019Open Access in inter-State Transmission (Fifth Amendment) Regulations, 2018
- Dated 12 Dec 2019Open Access in inter-State Transmission (Sixth Amendment) Regulations, 2019
- Dated 20 Mar 2020Open Access Regulations, 2008 — Sixth Amendment — Commencement Notification, 2020
- Dated 15 Jun 2010Changes some provisions: Sharing of ISTS Charges and Losses Regulations, 2010
- Dated 15 Jun 2010Changes some provisions: Sharing of Inter State Transmission Charges and Losses Regulations, 2010
Commencement notices and reasons
- Dated 4 Mar 2008Open Access in Inter-State Transmission System Regulations, 2008 — Statement of Reasons
- Dated 1 Jul 2009Open Access in Inter-State Transmission Regulations, 2008 — 2009 Amendment — Statement of Reasons
- Dated 12 May 2015Open Access in inter-State Transmission (Third Amendment) Regulations, 2015 — Statement of Objects and Reasons
- Dated 12 Jul 2016Open Access in inter-State Transmission (Fourth Amendment) Regulations, 2016 — Statement of Objects and Reasons
- Dated 2 Jan 2019Open Access in inter-State Transmission (Fifth Amendment) Regulations, 2018 — Statement of Reasons
- Dated 21 Mar 2022Notification — effective date 01.05.2022
- Dated 21 Mar 2022Open Access in inter-State Transmission (Fifth Amendment) Regulations, 2018 — Commencement Notification
- Date not statedReal-Time Market Framework — Statement of Reasons
Procedures and orders made under it
- Dated 1 Apr 2022Approval of Procedure for Short Term Open Access in inter-State Transmission System through NOAR, 2022
- Dated 1 Apr 2022Short Term Open Access in Inter-State Transmission through NOAR — Procedure, 2022
- Dated 6 May 2022Corrigendum to the NOAR STOA Procedure Order, 2022
- Date not statedProcedure for Short Term Open Access in inter-State Transmission System through NOAR, 2022
Other copies of these documents (6)
- Dated 25 Jan 2008Open Access in inter-State Transmission Regulations, 2008
- Dated 11 Sep 2013Open Access in inter-State Transmission Regulations, 2008 — Second Amendment, 2013
- Dated 12 May 2015Open Access in inter-State Transmission (Third Amendment) Regulations, 2015
- Dated 22 Jun 2016Open Access in inter-State Transmission (Fourth Amendment) Regulations, 2016
- Dated 2 Jan 2019Open Access in inter-State Transmission (Fifth Amendment) Regulations, 2018
- Dated 12 Dec 2019Open Access in inter-State Transmission Regulations, 2008 — Sixth Amendment, 2019
Earlier drafts
- Dated 3 Jul 2014Open Access in inter-State Transmission Regulations, 2008 — Third Amendment, 2014 — Draft
- Dated 3 Jul 2014Public notice: Open Access in inter-State Transmission (Third Amendment) Regulations, 2014 — Public Notice — Draft
- Released with the notice dated 3 Jul 2014Explanatory memorandum: Open Access in inter-State Transmission, 2008 — Third Amendment, 2014 — Explanatory Memorandum — Draft
- Dated 3 May 2016Open Access in inter-State Transmission, 2008 — Fourth Amendment, 2016 — Draft
- Dated 3 May 2016Public notice: Open Access in inter-State Transmission, 2008 — Fourth Amendment, 2016 — Public Notice — Draft
- Released with the notice dated 3 May 2016Explanatory memorandum: Open Access in Inter-state Transmission (Fourth Amendment) Regulations, 2016 — Explanatory Memorandum — Draft
- Dated 8 Aug 2018Open Access in inter-State Transmission Regulations, 2008 — Fifth Amendment, 2018 — Draft
- Released with the notice dated 8 Aug 2018Explanatory memorandum: Open Access in inter-State Transmission, 2008 — Fifth Amendment — Draft Explanatory Memorandum
- Dated 8 Aug 2018Public notice: Draft Open Access in inter-State Transmission (Fifth Amendment) Regulations, 2018 — Public Notice
- Dated 6 Aug 2019Open Access in inter-State Transmission Regulations, 2008 — Sixth Amendment, 2019 — Draft
2 more documents belong here and are not on Voltaic: 2 drafts or notices on a draft not held as English text.
It is also read with: Indian Electricity Grid Code Regulations, 2010
Draft · Explanatory memorandum to the Indian Electricity Grid Code, 2010 — Sixth Amendment, 2019 — Draft. The draft has since been finalised as the Indian Electricity Grid Code (Sixth Amendment) Regulations, 2019.
The regulation
- Dated 28 Apr 2010Indian Electricity Grid Code Regulations, 2010
Amendments and corrections
- Dated 28 Jun 2010Indian Electricity Grid Code Regulations, 2010 — Corrigendum
- Dated 28 Jun 2010Indian Electricity Grid Code Regulations, 2010 — Addendum
- Dated 5 Mar 2012Indian Electricity Grid Code (First Amendment) Regulations, 2012
- Dated 6 Jan 2014Indian Electricity Grid Code, 2010 — Second Amendment, 2014
- Dated 7 Aug 2015Indian Electricity Grid Code, 2010 — Third Amendment, 2015
- Dated 6 Apr 2016Indian Electricity Grid Code (Fourth Amendment) Regulations, 2016
- Dated 12 Apr 2017Indian Electricity Grid Code (Fifth Amendment) Regulations, 2017
- Dated 5 May 2017IEGC (Fourth Amendment) Regulations, 2016 — Regulation 6.3B Commencement Notification, 2017
- Dated 5 Sep 2019Indian Electricity Grid Code (Fifth Amendment) Regulations, 2017 — Erratum
- Dated 12 Dec 2019Indian Electricity Grid Code (Sixth Amendment) Regulations, 2019
- Dated 20 Mar 2020IEGC Regulations, 2010 — Sixth Amendment, 2019 — Commencement Notification, 2020
- Dated 17 May 2020IEGC Regulations, 2010 — Sixth Amendment — Corrigendum
Commencement notices and reasons
- Dated 18 Jun 2010Indian Electricity Grid Code Regulations, 2010 — Statement of Objects and Reasons
- Dated 6 Mar 2012Indian Electricity Grid Code (First Amendment) Regulations, 2012 — Statement of Objects and Reasons
- Dated 6 Apr 2016Indian Electricity Grid Code, 2010 — Fourth Amendment, 2016 — Statement of Reasons
- Dated 13 Apr 2018Indian Electricity Grid Code (5th Amendment), 2017 — Statement of Reasons
- Date not statedReal-Time Market Framework — Statement of Reasons
Procedures and orders made under it
- Dated 26 Apr 2010Indian Electricity Grid Code, 2010 — Order directing Gazette publication
- Dated 14 Jan 2011Extension of Date of Operation of Clauses 5 and 7 of Annexure-I, IEGC 2010 — Notification
- Dated 14 Jan 2011Extension of date of operation of Clauses 5 and 7 of Annexure-I, IEGC 2010
- Dated 18 Feb 2011Approval of Detailed Procedure for Implementation of Renewable Regulatory Fund Mechanism under IEGC Regulations, 2010
- Dated 5 May 2017Reserve Shut Down and Compensation Mechanism Order, 2017
- Dated 9 Oct 2019Methodology of Settlement of Accounts for Bilateral Short Term and Collective Transactions during Grid Disturbance — Order
Other copies of these documents (9)
- Dated 28 Apr 2010Indian Electricity Grid Code Regulations, 2010
- Dated 5 Mar 2012Indian Electricity Grid Code, 2010 — First Amendment, 2012
- Dated 6 Jan 2014Indian Electricity Grid Code (Second Amendment) Regulations, 2014
- Dated 7 Aug 2015Indian Electricity Grid Code, 2010 — Third Amendment, 2015
- Dated 7 Aug 2015Indian Electricity Grid Code, 2010 — Third Amendment, 2015
- Dated 6 Apr 2016Indian Electricity Grid Code (Fourth Amendment) Regulations, 2016
- Dated 12 Apr 2017Indian Electricity Grid Code (Fifth Amendment) Regulations, 2017
- Dated 5 May 2017IEGC (Fourth Amendment) Regulations, 2016 — Commencement Notification, 2017
- Dated 12 Dec 2019Indian Electricity Grid Code (Sixth Amendment) Regulations, 2019
Earlier drafts
- Dated 12 Aug 2013Indian Electricity Grid Code (Second Amendment) Regulations, 2013 — Draft
- Released with the notice dated 12 Aug 2013Explanatory memorandum: IEGC (Second Amendment) Regulations, 2013 — Explanatory Memorandum
- Dated 12 Aug 2013Public notice: Indian Electricity Grid Code (Second Amendment) Regulations, 2013 — Public Notice — Draft
- Released with the notice dated 31 Mar 2015Indian Electricity Grid Code, 2010 — Third Amendment, 2015 — Draft
- Dated 2 Jul 2015Draft Indian Electricity Grid Code Regulations, 2015 — Public Notice
- Dated 2 Jul 2015Indian Electricity Grid Code, 2010 — Fourth Amendment Regulations, 2015 — Draft
- Released with the notice dated 9 Dec 2016Indian Electricity Grid Code, 2010 — Fifth Amendment, 2016
- Dated 9 Dec 2016Public notice: Draft Indian Electricity Grid Code (Fifth Amendment) Regulation, 2016 — Public Notice
- Released with the notice dated 9 Dec 2016Explanatory memorandum: Explanatory Memorandum to the IEGC amendments (spinning reserves, ancillary services, un-requisitioned power)
- Dated 6 Aug 2019Indian Electricity Grid Code, 2010 — Sixth Amendment, 2019 — Draft
3 more documents belong here and are not on Voltaic: 2 drafts or notices on a draft and 1 draft or notice on a draft not held as English text.
It is also read with: Power Market Regulations, 2010
Draft · Explanatory memorandum to the Power Market (Second Amendment) Regulations, 2019 — Draft. The draft has since been finalised as the Power Market Regulations, 2010 — Second Amendment, 2019.
The regulation
- Dated 20 Jan 2010Power Market Regulations, 2010
Amendments and corrections
- Dated 3 Apr 2014Power Market Regulations, 2010 — First Amendment, 2014
- Dated 12 Dec 2019Power Market Regulations, 2010 — Second Amendment, 2019
- Dated 20 Mar 2020Power Market (Second Amendment) Regulations, 2019 — Commencement Notification
Commencement notices and reasons
Procedures and orders made under it
Other copies of these documents (3)
- Dated 20 Jan 2010Power Market Regulations, 2010
- Dated 3 Apr 2014Power Market Regulations, 2010 — First Amendment, 2014
- Dated 12 Dec 2019Power Market Regulations, 2010 — Second Amendment, 2019
Proposed changes (drafts with no final yet)
Earlier drafts
- Dated 7 Jan 2014Power Market (First Amendment) Regulations, 2014 — Draft
- Released with the notice dated 7 Jan 2014Explanatory memorandum: Power Market (First Amendment) Regulations, 2014 — Explanatory Memorandum — Draft
- Dated 7 Jan 2014Public notice: Power Market Regulations, 2010 — First Amendment, 2014 — Public Notice — Draft
- Dated 6 Aug 2019Power Market (Second Amendment) Regulations, 2019 — Draft
- Dated 6 Aug 2019Public notice: Proposed Real-Time Market framework — Public Notice, 2019
- Dated 30 Sep 2019Hearing notice: Public Notice — Proposed Framework for Real-Time Market for Electricity
Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.