Skip to content

CERC · Central Electricity Regulatory Commission

Power Market (Second Amendment) Regulations, 2019 — Draft

Central Electricity Regulatory Commission (Power Market) (Second Amendment) Regulations, 2019

Draft amendmentDated 6 Aug 2019L-1/13/2010/CERC dated 6th August, 2019

Draft

A proposal that has since been finalised as the Power Market Regulations, 2010 — Second Amendment, 2019.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a draft notification (p1) issued by the Central Electricity Regulatory Commission on 6 August 2019 proposing the Central Electricity Regulatory Commission (Power Market) (Second Amendment) Regulations, 2019, which would amend the CERC (Power Market) Regulations, 2010. It is made under section 66 read with section 178(2)(y) of the Electricity Act, 2003, and would come into force on 1 January 2020 or such other date as the Commission notifies (p1).

The substance is definitional and enabling. Clause 2 (p1–2) inserts new definitions into Regulation 2 of the Principal Regulations: "Collective Transaction" and "Continuous Transaction", distinguishing auction-discovered trades from trades matched continuously on price-time priority; "Day Ahead Market"; "Gate Closure" as it applies to bidding in the real-time market; and "Real-time Contract" and "Real-Time Market". It also substitutes the existing definition of "Intraday Contract / Contingency Contract" so that it is anchored to continuous transactions after the day-ahead window, with delivery on the same or next day and scheduling by the RLDC or NLDC (p2).

Clause 3 (p2–3) would add a new sub-clause to clause (iii) of Regulation 4, but the inserted text is not reproduced in the pages available. Clause 4 (p3) extends Regulation 11 so that its references to "day ahead markets" and "day ahead basis" also cover real-time markets and a real-time basis.

A closing Note (p3) records where the Principal Regulations were gazetted and lists a prior amendment. The notification is signed by the Secretary (p3).

Standard name
Power Market Regulations
Primary topics
Power markets and exchanges

Read with this

The regulation

Commencement notices and reasons

Other copies of these documents (3)

Proposed changes (drafts with no final yet)

Earlier drafts

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document