Deviation Settlement Mechanism and Related Matters Regulations, 2018 — Second Amendment, 2021 — Draft

Himachal Pradesh Electricity Regulatory Commission (Deviation Settlement Mechanism and Related Matters) (Second Amendment) Regulations, 2021

Draft amendmentDated 3 Jul 2021HPERC-H(1)25/2019 dated 3rd July, 2021

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on hperc.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a draft, published for consultation, of the second amendment to Himachal Pradesh's Deviation Settlement Mechanism (DSM) Regulations, 2018 (p1). The Commission states it wants to harmonise state practice with the Central Commission's DSM framework and with CERC's treatment of solar and wind (p1). The notification invites objections and suggestions within thirty days of publication in the Rajpatra and says the draft will be taken up only after that period (p1).

Clauses 1–2 (p2) fix the title and the commencement rule — 00:00 hrs of the Monday immediately following Rajpatra publication — and add a proviso to regulation 2 requiring the distribution licensee's deviation to be computed as a buyer on a net basis, even where it exports to the grid in some time blocks.

Clauses 3–7 (p2–4) amend the operative regulations: the regulation 5 tolerance band is replaced by a cross-reference to regulation 9; solar/wind transactions are carved out to the new Schedule; state entities must give SLDC real-time telemetry at RLDC-equivalent update frequency and follow CERC's 2017 Communication Systems Regulations until the Commission notifies its own; regulation 7's receivables treatment is split between the distribution licensee and other state entities; regulation 8 gains a drawal-deviation ceiling for the distribution licensee within a frequency band; regulation 9 gains a deeming floor for small distribution licensee schedules and an exemption for pre-COD start-up drawal; and regulation 9A is aligned with the solar/wind carve-out.

Clause 8 (p5–8) adds a Schedule covering solar/wind sale, purchase and captive consumption. It scopes five transaction types, defines absolute error and available capacity, prescribes deviation charges for intra-state and inter-state transactions, requires SLDC to mirror NRLDC's treatment, and treats the distribution licensee as a separate state entity for dedicated solar/wind transactions. Everything else in regulations 1–20, including payment provisions, continues to apply (p8).

Standard name
DSM Regulations
Primary topics
Deviation settlement (DSM), Communication and SCADA, Energy accounting and settlement

Read with this

Voltaic last read HPERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document HPERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on hperc.org ↗

Report an issue with this document