HPERC · Himachal Pradesh Electricity Regulatory Commission
Deviation Settlement Mechanism and Related Matters Regulations, 2018 — First Amendment, 2019
Himachal Pradesh Electricity Regulatory Commission (Deviation Settlement Mechanism and Related Matters) (First Amendment) Regulations, 2019
AmendmentDated 29 Jun 2019HPERC-H(1)25.- dated 29th June, 2019
Replaced by Deviation Settlement Mechanism and Related Matters Regulations, 2024
See that regulation for the date it took effect and for anything it keeps in force.
Amends the Deviation Settlement Mechanism and Related Matters Regulations, 2018.
Saving clause of the regulation that replaces it: “Notwithstanding such repeal, anything done or any action taken or purported to have been done or taken including any procedure, minutes, reports, confirmation, settlement of dues and requirement for opening of the Letter of Credit etc.”
Summary
Summary written by software. Check the regulator's original before you rely on it.
The Himachal Pradesh Electricity Regulatory Commission's First Amendment to its 2018 Deviation Settlement Mechanism (DSM) Regulations rewrites the state's frequency-linked deviation pricing and adds an enforcement regime for sustained deviations (p1). It was notified at Shimla on 29 June 2019 and comes into force from 00:00 hrs of the Monday immediately after publication in the Rajpatra, Himachal Pradesh; the Gazette date itself is not printed (p1).
The amendment first adds definitions — Area Clearing Price, Daily Base DSM, Day Ahead Market, Simple Average Area Clearing Price and Time Block DSM — tying state DSM to prices discovered on the power exchange and to the CERC DSM Regulations, 2014 (p1–2). It then replaces the frequency-based charge table in regulation 7, making the deviation charge a function of the daily simple average area clearing price along a frequency vector running from 50.05 Hz down to below 49.85 Hz, with notes on the slope, ceiling, rounding and treatment of no-trade days, and makes the SLDC responsible for declaring and publishing the rates (p2–3).
The frequency thresholds used in regulations 5, 8, 9 and 10 are moved to 49.85 Hz, with the corresponding price caps set at 800 Paise/kWh (p2, p4, p7). A new regulation 9A creates additional charges where a State Entity's sustained deviation does not change sign or return within permissible limits, on a phased timetable (before and after 1 April 2020), supported by a table of permissible sustained-deviation limits, a table of violation charges, exemptions for testing-and-commissioning injection and start-up drawal, and worked illustrations (p4–7).
Regulation 12 now requires daily, regulation-wise proportionate sharing of any shortfall against NRLDC/NRPC bills, and regulation 14 shortens the payment window, adds interest on long delay and gives the SLDC power to curtail the schedule of a defaulting entity (p7–8). All charges are levied without prejudice to action under section 142 of the Act (p7).
Read with this
The regulation
- Dated 16 Oct 2018Deviation Settlement Mechanism and Related Matters Regulations, 2018
Amendments and corrections
Commencement notices and reasons
Procedures and orders made under it
- Dated 7 Sep 2021DSM Second Amendment Regulations, 2021 — Finalisation Order
Earlier drafts
One more document belongs here and is not on Voltaic: a draft or notice on a draft.
Voltaic last read HPERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document HPERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.