HPERC · Himachal Pradesh Electricity Regulatory Commission
Deviation Settlement Mechanism and Related Matters Regulations, 2018
Himachal Pradesh Electricity Regulatory Commission (Deviation Settlement Mechanism and Related Matters) Regulations, 2018
RegulationDated 16 Oct 2018In force from 3 Dec 2018HPERC-H(1)25/2017 dated 16th October, 2018
Replaced by Deviation Settlement Mechanism and Related Matters Regulations, 2024
See that regulation for the date it took effect and for anything it keeps in force.
Saving clause of the regulation that replaces it: “Notwithstanding such repeal, anything done or any action taken or purported to have been done or taken including any procedure, minutes, reports, confirmation, settlement of dues and requirement for opening of the Letter of Credit etc.”
Summary
Summary written by software. Check the regulator's original before you rely on it.
The Himachal Pradesh Electricity Regulatory Commission's Deviation Settlement Mechanism Regulations, 2018 (notification HPERC-H(1)25/2017, Shimla, 16 October 2018) create the intra-State commercial mechanism that penalises grid users whose actual drawal or injection departs from schedule. They commence at 00 hrs on 3 December 2018, with an interim window from Rajpatra publication for the SLDC and State Entities to prepare (p1).
Regulation 2 (p1–4) fixes the vocabulary — State Entity/Constituent, deviation, time-block, the State and STU periphery, Un-Requisitioned Surplus, and the Qualified Coordinating Agency that aggregates and settles on behalf of RE generators. Regulation 4 (p4–5) sets scope on the State distribution licensee(s), State-sector generating stations and open access customers on the State grid, with an explanation folding generating stations that sell their entire output to the licensee into the licensee's own accounting.
Regulation 5 (p5–10) is the design framework: 96 fifteen-minute time blocks with migration to 288 five-minute blocks on notification; merit-order day-ahead despatch; the frequency operating band and bans on over-drawal below 49.70 Hz and under-drawal above 50.05 Hz; consolidated scheduling at the State periphery with loss loading; weekly deviation pool accounts; kWh/INR units; loss allocation and reconciliation; data submission duties; SLDC procurement of URS (with a 90-day deadline for a uniform procedure); congestion charges; and weekly SEM download duties.
Regulation 6 (p10–11) leaves declaration, scheduling and gaming control to the Grid Code and open-access regulations, and lets the Commission disallow deviation charges for established gaming. Regulation 7 with Table-1 (p11–12) gives the frequency-linked deviation price vector, zero receivables beyond 12% deviation, and treatment of pre-COD infirm power. Regulations 8–9 (p12–14) set volume limits by frequency band and additional charges for crossing them.
Regulations 10–12 (p14–16) cover contravention and s.142 exposure, weekly publication and quarterly reporting, priority of SLDC instructions, and the billing machinery — weekly statements, the State Deviation Pool Account with a fixed payment waterfall, and pass-through of NRPC bills. Regulation 13 (p16–18) handles consumers who are both open access customers and retail consumers. Regulation 14 (p18–20) sets payment deadlines, delay interest and Letter of Credit security. Regulation 15 (p20) routes surplus pool balances to the State Power Systems Development Fund. Regulations 16–20 (p20–21) give the Commission powers to relax, direct, amend, remove difficulties, and override inconsistent regulations.
Read with this
Amendments and corrections
Commencement notices and reasons
Procedures and orders made under it
- Dated 7 Sep 2021DSM Second Amendment Regulations, 2021 — Finalisation Order
Earlier drafts
One more document belongs here and is not on Voltaic: a draft or notice on a draft.
Voltaic last read HPERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document HPERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.