HPERC · Himachal Pradesh Electricity Regulatory Commission

Deviation Settlement Mechanism and related matters Regulations, 2018 — Draft

Himachal Pradesh Electricity Regulatory Commission (Deviation Settlement Mechanism and related matters) Regulations, 2018

Draft regulationDated 27 Jun 2018HPERC-H(1)25/2017.- dated 27th June, 2018

Draft

A proposal that has since been finalised as the Deviation Settlement Mechanism and Related Matters Regulations, 2018.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on hperc.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a notification dated 27 June 2018 by which the Himachal Pradesh Electricity Regulatory Commission publishes, for objections, draft regulations creating a consolidated intra-State deviation settlement mechanism (p1). The Commission says it wants to harmonise State practice with that of the Central Commission, and that the regulations will be given effect from 5 November 2018 so that SLDC and State entities can prepare and so that consequential changes can be made to the Open Access Regulations in the interim (p1–2). Objections or suggestions must reach the Secretary within thirty days of publication in the Rajpatra, Himachal Pradesh (p1).

The draft runs to twenty regulations. Regulations 1 and 2 give the short title, commencement and the defined terms — buyer, seller, State Entity, deviation, time block, QCA, un-requisitioned surplus and others (p2–5). Regulation 3 states the objective, grid discipline and grid security through a commercial deviation mechanism, and regulation 4 fixes the scope: State distribution licensees, State sector generating stations and open access customers connected to the State grid, with an explanation of when a generator selling wholly to the distribution licensee is not treated as a separate State Entity (p5).

Regulation 5 is the design core, setting out eleven parameters of the mechanism — scheduling period, least-cost day-ahead despatch, the frequency operating range, how deviation is defined and measured, weekly settlement, units and rounding, the price vector, volume limits, allocation of losses among State Entities, data submission by non-State-Entity generators, and SLDC procurement of URS (p5–9). Regulation 6 governs declaration, scheduling and proceedings against gaming (p9–10).

Regulations 7 to 9 carry the money: a frequency-linked schedule of charges for deviation, with zero receivables beyond the permitted band and special treatment of infirm power (p10–11); the volume limits on over-drawal, under-drawal, over-injection and under-injection (p11–12); and additional charges for crossing those limits, for over-injection/under-drawal at high frequency and for violations below the lower frequency bound (p12–13).

Regulation 10 covers reporting, contravention and publication of deviation accounts on the SLDC website, and regulation 11 requires strict compliance with SLDC instructions (p13). Regulation 12 sets the accounting and billing machinery, including the State Deviation Pool Account and the order in which receipts are applied (p13–16). Regulation 13 gives special billing treatment to open access customers who are also retail consumers (p16–17). Regulation 14 sets the payment timetable, interest for delay and Letter of Credit requirements (p17–19). Regulation 15 directs surpluses to a State Power Systems Development Fund (p19), and regulations 16 to 20 give the Commission powers to relax, direct, amend and remove difficulties, and an overriding effect over inconsistent regulations (p19–20).

Standard name
DSM Regulations
Primary topics
Deviation settlement (DSM), Energy accounting and settlement, Billing and payment

Read with this

Voltaic last read HPERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document HPERC issued after the page that lists it was read may not be held by Voltaic yet.