HPERC · Himachal Pradesh Electricity Regulatory Commission
Order on Finalisation of Deviation Settlement Mechanism and Related Matters Regulations, 2018
In the matter of draft Himachal Pradesh Electricity Regulatory Commission (Deviation Settlement Mechanism and related matters) Regulations, 2018.
OrderDated 16 Oct 2018Published in the Gazette 29 Jun 2018In force from 3 Dec 2018
Replaced by Deviation Settlement Mechanism and Related Matters Regulations, 2024
See that regulation for the date it took effect and for anything it keeps in force.
Read with the Deviation Settlement Mechanism and Related Matters Regulations, 2018.
Saving clause of the regulation that replaces it: “Notwithstanding such repeal, anything done or any action taken or purported to have been done or taken including any procedure, minutes, reports, confirmation, settlement of dues and requirement for opening of the Letter of Credit etc.”
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is the Himachal Pradesh Electricity Regulatory Commission's order disposing of the objections and suggestions received on the draft HPERC (Deviation Settlement Mechanism and related matters) Regulations, 2018, and directing what must be changed before the regulations are finalised (p1, p12). It records that the regulations were published in the Rajpatra, Himachal Pradesh dated 29 June 2018 (p1), that public objections were invited through Hindustan Times and Dainik Bhaskar on 4 July 2018 and copy on the Commission's website, with a deadline of 30 July 2018, and that written submissions came from ACC Ltd (Gagal), HPSEBL, the Directorate of Energy and HPPCL (p1).
Parts A to E (pp1–4) settle the contested design points by reasoning rather than text alone: the Commission refuses a fixed megawatt floor for the minimum deviation volume and retains a percentage-of-schedule basis drawn from CERC's DSM framework (pp1–2); refuses force majeure relief from deviation charges for open access consumers, since NRLDC/NRPC levy them regardless of cause (p2); agrees in principle to a clause in regulation 5 for recovery and apportionment of NRLDC congestion charges, with SLDC timelines for apportionment and payment (pp2–3); retains the additional deviation charge despite open access viability arguments (p3); and substitutes regulation 14(3) so that net receivers in the deviation pool also earn interest on delayed payments (p4).
Part F (pp4–12) works through sixteen miscellaneous comments and directs concrete textual changes: substitution of regulation 7(2) on review of deviation charges; substitution of regulation 15 creating the State Power Systems Development Fund, operated by SLDC with half-yearly returns; new definitions of State Periphery/HP Periphery and STU Periphery with consequent renumbering; a new clause (L) on SLDC procurement of un-requisitioned surplus; a new clause (N) on weekly SEM meter-data downloading; an amended clause (J) on loss allocation; and an elaborated clause (D) on projecting State Entity schedules to the State periphery (pp6–12). Several suggestions are rejected, including sub-dividing the time block, sharing URS cost on an average basis, and individual petitions for review of deviation charges (pp4, 6, 8). Commencement is fixed at 3 December 2018 (p12).
Read with this
The regulation
- Dated 16 Oct 2018Deviation Settlement Mechanism and Related Matters Regulations, 2018
Amendments and corrections
Commencement notices and reasons
Procedures and orders made under it
- Dated 7 Sep 2021DSM Second Amendment Regulations, 2021 — Finalisation Order
Earlier drafts
One more document belongs here and is not on Voltaic: a draft or notice on a draft.
Voltaic last read HPERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document HPERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.