CERC · Central Electricity Regulatory Commission
DSM Regulations, 2022 — Directions in the Interest of Grid Security, 2023
Directions in the interest of grid security, in pursuance of the provisions of the Electricity Act, 2003 and the provisions of the Central Electricity Regulatory Commission (Deviation Settlement Mechanism and Related Matters) Regulations, 2022
OrderDated 6 Feb 2023In force from 8 Feb 2023Petition No. 01/SM/2023 dated 06th February, 2023
Replaced by Deviation Settlement Mechanism and Related Matters Regulations, 2024
See that regulation for the date it took effect and for anything it keeps in force.
Made under the Deviation Settlement Mechanism and Related Matters Regulations, 2022.
Saving clause of the regulation that replaces it: “Notwithstanding such repeal, anything done or any action taken or purported to have been done or taken, including any procedure, minutes, reports, confirmation or declaration of any instrument executed under the repealed regulations, shall be deemed to have been done or taken under the relevant provisions of these regulations.”
Summary
Summary written by software. Check the regulator's original before you rely on it.
CERC's suo motu order in Petition No. 01/SM/2023, dated 6 February 2023, responds to grid frequency behaviour after the DSM Regulations, 2022 came into force on 05.12.2022 (p1). The Commission records Grid-India's operational feedback that the share of time frequency stayed within the operating band fell after the new regime began, that excursions above 50.2 Hz multiplied, and that matters improved only partly after its 26.12.2022 directions (p2). It also records State entities continuing to under-draw during high-frequency events and over-draw during low-frequency events (p3), generators' complaints about operating inside the tight +/-2% band, and wind and solar associations' complaint that the incentive structure pushed them to over-schedule and under-inject (p4).
Finding that ancillary services are not being used as intended and that reserves are being consumed to meet regular energy needs rather than contingency (pp4–5), the Commission invokes Regulation 11 (Power to Relax) and Regulation 12 (Power to Remove Difficulty) of the DSM Regulations, 2022 and s.79(1)(c) of the Electricity Act, 2003 (pp6–7).
The operative part issues interim practice directions. Regulation 7 is relaxed so that the normal rate of deviation charges tracks the higher of the weighted average day-ahead market and real-time market clearing prices of all power exchanges, subject to a ceiling of Rs 12 per kWh (p7). Regulation 8 is effectively re-drafted until further orders: volume slabs for seller over-injection and under-injection and for buyer over-drawal and under-drawal (pp7–10), with distinct treatment for general sellers that are run-of-river stations or municipal-solid-waste based stations, for wind and solar (WS) sellers, for buyers in RE-rich States, and for States with net injection (pp7–12). Clauses 2A–2C bolt frequency-linked pay-back multipliers and zero-payment provisions onto that structure whenever frequency falls below 49.95 Hz or rises above 50.03 Hz, overriding the volume limits (pp11–12). Clauses 3–7 cover infirm power, start-up and shut-down auxiliary drawal, inter-regional and cross-border deviation, forced-outage relief, multiple contracts, and net-injection States (p12).
The order also decides to set up a high-level committee of experts to examine inadequate primary and secondary response, and to roll out tertiary reserves (TRAS) with the date of effect to be notified separately (p6). It takes effect from 00.00 hours on 08.02.2023 and remains in force until further orders, supersedes the directions of 26.12.2022, disposes of the petition, and states that formal amendments to the DSM Regulations, 2022 will follow separately (p13).
Read with this
The regulation
- Dated 14 Mar 2022Deviation Settlement Mechanism and Related Matters Regulations, 2022
Commencement notices and reasons
Procedures and orders made under it
Other copies of these documents (1)
- Dated 14 Mar 2022Deviation Settlement Mechanism and Related Matters Regulations, 2022
Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.