Skip to content

CERC · Central Electricity Regulatory Commission

Deviation Settlement Mechanism and Related Matters Regulations, 2024

Central Electricity Regulatory Commission (Deviation Settlement Mechanism and Related Matters) Regulations, 2024

RegulationDated 5 Aug 2024No. L-1/260/2021/CERC dated 05th August, 2024

3 amendments to it are on Voltaic, the latest dated 25 Aug 2026.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is CERC's replacement framework for deviation settlement — the commercial mechanism that pushes grid users to stick to their schedules. It was issued on 5 August 2024 as Notification No. L-1/260/2021/CERC under s.178 read with s.79(1)(c) and (h) of the Electricity Act, 2003, but it does not start on its own: Regulation 1(2) leaves commencement to a separate Commission notification (p1). It applies to all grid-connected regional entities and other entities engaged in inter-State purchase and sale of electricity (p5).

Regulations 1–3 do the framing — title, objective, and an unusually long definitions list that fixes the commercial vocabulary (WS seller, MSW seller, general seller, contract rate, reference charge rate, area clearing price, RE-rich states). Regulations 4–5 set scope and the basic obligation to adhere to schedule, with deviation to be managed principally through Ancillary Services (p1–5).

Regulation 6 gives the arithmetic for computing deviation separately for general sellers, wind/solar/hybrid sellers and buyers, and stages a change of basis for WS sellers from 1 April 2026, with a weighting factor 'X' left to a later Commission order (p5–6). Regulation 7 defines the Normal Rate as the highest of three market-based benchmarks, one of which blends day-ahead and real-time clearing prices with an ancillary service charge (p6).

Regulation 8 is the operative charging schedule, split by seller class — general sellers (frequency-linked), run-of-river hydro, municipal solid waste, WS sellers, standalone storage and buyers — each with its own over-injection / under-injection and volume-limit grid, plus special rules for infirm power, start-up power, cross-border transactions and forced outages (p7–13).

Regulation 9 establishes the Deviation and Ancillary Service Pool Account at each RLDC, lists its credits and debits, and governs how a regional deficit is met from other regions and then recovered from drawee DICs. Regulation 10 fixes a ten-day payment deadline, a late payment surcharge and letter-of-credit backing (p13–15). Regulations 11–12 give the Commission power to relax provisions and to issue practice directions; Regulation 13 repeals the 2022 DSM Regulations with a savings clause (p15–16).

Standard name
DSM Regulations
Primary topics
Deviation settlement (DSM), Ancillary services and reserves, Energy accounting and settlement

Read with this

Other copies of these documents (4)

Earlier drafts

9 more documents belong here and are not on Voltaic: 6 drafts or notices on a draft not held as English text, 2 drafts or notices on a draft and 1 procedure or order made under it.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

As of its reading of CERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document