Deviation Settlement Mechanism and Related Matters Regulations, 2022

Central Electricity Regulatory Commission (Deviation Settlement Mechanism and Related Matters) Regulations, 2022

Regulation · Gazette copyDated 14 Mar 2022Published in the Gazette 22 Mar 2022No. L-1/260/2021/CERC dated the 14th March, 2022

Replaced by Deviation Settlement Mechanism and Related Matters Regulations, 2024

See that regulation for the date it took effect and for anything it keeps in force.

The Gazette copy of the Deviation Settlement Mechanism and Related Matters Regulations, 2022.

Saving clause of the regulation that replaces it: “Notwithstanding such repeal, anything done or any action taken or purported to have been done or taken, including any procedure, minutes, reports, confirmation or declaration of any instrument executed under the repealed regulations, shall be deemed to have been done or taken under the relevant provisions of these regulations.”

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the Central Electricity Regulatory Commission's principal Deviation Settlement Mechanism regulation, notified as No. L-1/260/2021/CERC and published in the Gazette of India on 22 March 2022 (p1), though the Commission's notification itself is dated 14 March 2022 (p9). It replaces the 2014 DSM regulations. It does not fix its own commencement: the regulations take effect "on such date as may be notified by the Commission separately" (p9).

After a preamble and notification recital, Regulations 1-4 give the title, a deferred commencement, the objective and the definitions, and set scope over all grid-connected regional entities and other entities engaged in inter-State purchase and sale of electricity (p9-10). Regulation 5 obliges every regional entity to adhere to its Grid Code schedule and routes deviations to the Load Despatch Centre under the Ancillary Services Regulations (p10). Regulation 6 supplies the computation of deviation — in MWh and as a percentage — separately for general sellers, wind/solar/hybrid ("WS") sellers (denominated on available capacity) and buyers (p10-11).

Regulation 7 defines the normal rate of charges for deviation, anchored to the weighted average ancillary service charge, with a transitional one-year alternative pegged to the highest of Day Ahead Market ACP, Real Time Market ACP and the ancillary service charge (p11). Regulation 8 is the operative charging scheme: slab-wise tables of charges payable by sellers and buyers by direction of deviation, plus special cases — infirm power, start-up power, auxiliary drawal during shutdown, and inter-regional and cross-border deviation (p11-13). Regulations 9 and 10 set the weekly accounting cycle through the RLDCs and RPC secretariats, the credit/debit design of the Deviation and Ancillary Service Pool Account, inter-region deficit sharing, and payment deadlines, late payment surcharge and Letter of Credit requirements (p13-14). Regulations 11-13 give the Commission power to relax and to remove difficulty through practice directions, and repeal the 2014 regulations with savings and a renaming of the old pool account (p14-15).

Standard name
DSM Regulations
Primary topics
Deviation settlement (DSM), Energy accounting and settlement, Payment security

Read with this

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document