DERC · Delhi Electricity Regulatory Commission
Group Net Metering and Virtual Net Metering for Renewable Energy (Seventh Amendment) Guidelines, 2025 — Draft
Delhi Electricity Regulatory Commission (Group Net Metering and Virtual Net Metering for Renewable Energy) (Seventh Amendment) Guidelines, 2025
Draft amendmentDated 17 Dec 2025F.3(620)/Tariff-Engg./DERC/2020-21/6846 dated 17/12/2025
Draft
A proposal that has since been finalised as the Group Net Metering and Virtual Net Metering for Renewable Energy Guidelines, 2019 — Seventh Amendment, 2025.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is a draft amendment issued by the Delhi Electricity Regulatory Commission on 17 December 2025, the seventh to the DERC (Group Net Metering and Virtual Net Metering for Renewable Energy) Guidelines, 2019 (p1). It is a short instrument — five clauses over two pages — each of which substitutes a provision of the Principal Guidelines.
Clause 1 gives the title and provides that the amendment takes effect from the date it is uploaded on the DERC website and stays in force until further amendment; no uploading date is printed (p1). Clause 2 rewrites the applicability clause so that the Virtual Net Metering framework covers all consumers of NCT of Delhi, expressly including consumers on a single point of supply (p1). Clause 3 replaces the clause governing a consumer's option to change its share of credit or to add participating service connections, permitting this twice in a financial year with two months' advance notice under the existing agreement/MoU (p1). Clause 4 changes the time block referred to in the credit clause from 'off peak' to 'normal' (p1).
Clause 5 carries the commercial substance for licensees: distribution licensees must facilitate and bear capital expenditure on service line cum development and network augmentation for renewable energy projects and pass it through in ARR, with the waiver confined to 11 kV and below network and capped cumulatively at 110 MW, 100 MW, 30 MW and 10 MW for BRPL, TPDDL, BYPL and NDMC respectively; licensees must also submit quarterly progress reports on NM, GNM and VNM to the Commission and EE&RM, DoP, GoNCTD (p2).
Read with this
The regulation
Amendments and corrections
- Dated 19 Oct 2020Group Net Metering and Virtual Net Metering for Renewable Energy (First Amendment) Guidelines, 2020
- Dated 24 Dec 2020Group Net Metering and Virtual Net Metering for Renewable Energy (Second Amendment) Guidelines, 2020
- Dated 28 Sep 2021Group Net Metering and Virtual Net Metering for Renewable Energy (Third Amendment) Guidelines, 2021
- Dated 24 Feb 2022Group Net Metering and Virtual Net Metering for Renewable Energy Guidelines, 2019 — Fourth Amendment, 2022
- Dated 15 Mar 2024Group Net Metering and Virtual Net Metering for Renewable Energy (Fifth Amendment) Guidelines, 2024
- Dated 5 Jun 2025Group Net Metering and Virtual Net Metering for Renewable Energy (Sixth Amendment) Guidelines, 2025
- Dated 20 Jan 2026Group Net Metering and Virtual Net Metering for Renewable Energy Guidelines, 2019 — Seventh Amendment, 2025
Earlier drafts
- Dated 19 May 2025Group Net Metering and Virtual Net Metering for Renewable Energy Guidelines, 2019 — Sixth Amendment, 2025 — Draft
- Dated 19 May 2025Public notice: Group Net Metering and Virtual Net Metering for Renewable Energy Guidelines, 2019 — Sixth Amendment, 2025 — Public Notice on Draft
- Dated 17 Dec 2025Public notice: Group Net Metering and Virtual Net Metering for Renewable Energy (Seventh Amendment) Guidelines, 2025 — Public Notice
Voltaic last read DERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document DERC issued after the page that lists it was read may not be held by Voltaic yet.