DERC · Delhi Electricity Regulatory Commission
Group Net Metering and Virtual Net Metering for Renewable Energy Guidelines, 2019 — Seventh Amendment, 2025
Delhi Electricity Regulatory Commission (Group Net Metering and Virtual Net Metering for Renewable Energy) (Seventh Amendment) Guidelines, 2025
AmendmentDated 20 Jan 2026F.17(44)/Engg./DERC/2023-24/8071 dated 20/01/2026
Amends the Group Net Metering and Virtual Net Metering for Renewable Energy Guidelines, 2019.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is the Seventh Amendment to DERC's 2019 Group Net Metering (GNM) and Virtual Net Metering (VNM) Guidelines, issued under s.181 read with s.61(h) and s.86(1)(e) of the Electricity Act, 2003 and uploaded on the DERC website (p1). It is short and operative: five clauses, four of which change the Principal Guidelines.
The headline change is applicability. Guideline 3(2) is substituted so VNM applies to all consumers of NCT of Delhi, including those on a single point of supply (p1). Guideline 9(2)(b) now lets consumers reallocate their renewable-energy credit share (within procurement ratios) or add service connections to an existing VNM arrangement twice a financial year, with two months' advance notice under their agreement or MoU (p1). Guideline 9(2)(d)'s timing reference shifts from 'off peak time block' to 'normal time block' (p1).
Guideline 3(6) places the capital cost of service line cum development and network augmentation for GNM/VNM projects on distribution licensees, with pass-through in ARR, but the waiver is limited to the 11 kV and below network and capped by cumulative capacity in each licensee's area — the caps are 110 MW (BRPL), 100 MW (TPDDL), 30 MW (BYPL) and 10 MW (NDMC) (p2). Licensees must also file quarterly progress reports on net metering, GNM and VNM with the Commission and EE&RM, DoP, GoNCTD (p2). Signed by the Jt. Director (PS&E) and dated 20/01/2026 (p2).
Read with this
The regulation
Amendments and corrections
- Dated 19 Oct 2020Group Net Metering and Virtual Net Metering for Renewable Energy (First Amendment) Guidelines, 2020
- Dated 24 Dec 2020Group Net Metering and Virtual Net Metering for Renewable Energy (Second Amendment) Guidelines, 2020
- Dated 28 Sep 2021Group Net Metering and Virtual Net Metering for Renewable Energy (Third Amendment) Guidelines, 2021
- Dated 24 Feb 2022Group Net Metering and Virtual Net Metering for Renewable Energy Guidelines, 2019 — Fourth Amendment, 2022
- Dated 15 Mar 2024Group Net Metering and Virtual Net Metering for Renewable Energy (Fifth Amendment) Guidelines, 2024
- Dated 5 Jun 2025Group Net Metering and Virtual Net Metering for Renewable Energy (Sixth Amendment) Guidelines, 2025
Earlier drafts
- Dated 19 May 2025Group Net Metering and Virtual Net Metering for Renewable Energy Guidelines, 2019 — Sixth Amendment, 2025 — Draft
- Dated 19 May 2025Public notice: Group Net Metering and Virtual Net Metering for Renewable Energy Guidelines, 2019 — Sixth Amendment, 2025 — Public Notice on Draft
- Dated 17 Dec 2025Group Net Metering and Virtual Net Metering for Renewable Energy (Seventh Amendment) Guidelines, 2025 — Draft
- Dated 17 Dec 2025Public notice: Group Net Metering and Virtual Net Metering for Renewable Energy (Seventh Amendment) Guidelines, 2025 — Public Notice
Voltaic last read DERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document DERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.