Group Net Metering and Virtual Net Metering for Renewable Energy Guidelines, 2019 — Seventh Amendment, 2025

Delhi Electricity Regulatory Commission (Group Net Metering and Virtual Net Metering for Renewable Energy) (Seventh Amendment) Guidelines, 2025

AmendmentDated 20 Jan 2026F.17(44)/Engg./DERC/2023-24/8071 dated 20/01/2026

Amends the Group Net Metering and Virtual Net Metering for Renewable Energy Guidelines, 2019.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on derc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the Seventh Amendment to DERC's 2019 Group Net Metering (GNM) and Virtual Net Metering (VNM) Guidelines, issued under s.181 read with s.61(h) and s.86(1)(e) of the Electricity Act, 2003 and uploaded on the DERC website (p1). It is short and operative: five clauses, four of which change the Principal Guidelines.

The headline change is applicability. Guideline 3(2) is substituted so VNM applies to all consumers of NCT of Delhi, including those on a single point of supply (p1). Guideline 9(2)(b) now lets consumers reallocate their renewable-energy credit share (within procurement ratios) or add service connections to an existing VNM arrangement twice a financial year, with two months' advance notice under their agreement or MoU (p1). Guideline 9(2)(d)'s timing reference shifts from 'off peak time block' to 'normal time block' (p1).

Guideline 3(6) places the capital cost of service line cum development and network augmentation for GNM/VNM projects on distribution licensees, with pass-through in ARR, but the waiver is limited to the 11 kV and below network and capped by cumulative capacity in each licensee's area — the caps are 110 MW (BRPL), 100 MW (TPDDL), 30 MW (BYPL) and 10 MW (NDMC) (p2). Licensees must also file quarterly progress reports on net metering, GNM and VNM with the Commission and EE&RM, DoP, GoNCTD (p2). Signed by the Jt. Director (PS&E) and dated 20/01/2026 (p2).

Standard name
Net Metering and Rooftop Solar
Primary topics
Net metering, Capital cost and investment, Connection and miscellaneous charges

Read with this

Voltaic last read DERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document DERC issued after the page that lists it was read may not be held by Voltaic yet.