Group Net Metering and Virtual Net Metering for Renewable Energy Guidelines, 2019 — Fourth Amendment, 2022

Delhi Electricity Regulatory Commission (Group Net Metering and Virtual Net Metering for Renewable Energy) (Fourth Amendment) Guidelines, 2022

AmendmentDated 24 Feb 2022F.3(620)/Tariff-Engg./DERC/2020-21/6846 dated 24/02/2022

Amends the Group Net Metering and Virtual Net Metering for Renewable Energy Guidelines, 2019.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on derc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the Fourth Amendment, 2022 to DERC's Group Net Metering and Virtual Net Metering for Renewable Energy Guidelines, 2019. It was issued on 24 February 2022 and carries only two operative clauses (p1).

Clause 1 gives the short title and states commencement: the amendment takes effect from the date it is uploaded on the DERC website, not from a printed Gazette date (p1).

Clause 2 substitutes Guideline 13 of the Principal Guidelines in full (p1). The new Guideline 13 keeps the substantive exemption — a renewable energy system commissioned under the DERC (Net Metering for Renewable Energy) Regulations, 2014 is exempt, for its useful life, from wheeling charge, banking charge, cross subsidy surcharge and any other charge the Commission may decide by order. What changes is the window and the ceiling: the exemption now runs until a system is commissioned by 31 March 2024, or until additional capacity reaches 75 MW, 50 MW, 30 MW and 10 MW for BRPL, TPDDL, BYPL and NDMC respectively for Virtual and Group Net Metering projects in each distribution licensee, whichever is earlier (p1). The clause it replaces had set 31 March 2022 as the cut-off and carried no capacity cap.

The document binds the four named Delhi distribution licensees and serves renewable energy generators and prosumers using group or virtual net metering.

Standard name
Net Metering and Rooftop Solar
Primary topics
Net metering, Open access charges

Read with this

Voltaic last read DERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document DERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on derc.gov.in ↗

Report an issue with this document