DERC · Delhi Electricity Regulatory Commission
Group Net Metering and Virtual Net Metering for Renewable Energy Guidelines, 2019 — Fourth Amendment, 2022
Delhi Electricity Regulatory Commission (Group Net Metering and Virtual Net Metering for Renewable Energy) (Fourth Amendment) Guidelines, 2022
AmendmentDated 24 Feb 2022F.3(620)/Tariff-Engg./DERC/2020-21/6846 dated 24/02/2022
Amends the Group Net Metering and Virtual Net Metering for Renewable Energy Guidelines, 2019.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is the Fourth Amendment, 2022 to DERC's Group Net Metering and Virtual Net Metering for Renewable Energy Guidelines, 2019. It was issued on 24 February 2022 and carries only two operative clauses (p1).
Clause 1 gives the short title and states commencement: the amendment takes effect from the date it is uploaded on the DERC website, not from a printed Gazette date (p1).
Clause 2 substitutes Guideline 13 of the Principal Guidelines in full (p1). The new Guideline 13 keeps the substantive exemption — a renewable energy system commissioned under the DERC (Net Metering for Renewable Energy) Regulations, 2014 is exempt, for its useful life, from wheeling charge, banking charge, cross subsidy surcharge and any other charge the Commission may decide by order. What changes is the window and the ceiling: the exemption now runs until a system is commissioned by 31 March 2024, or until additional capacity reaches 75 MW, 50 MW, 30 MW and 10 MW for BRPL, TPDDL, BYPL and NDMC respectively for Virtual and Group Net Metering projects in each distribution licensee, whichever is earlier (p1). The clause it replaces had set 31 March 2022 as the cut-off and carried no capacity cap.
The document binds the four named Delhi distribution licensees and serves renewable energy generators and prosumers using group or virtual net metering.
Read with this
The regulation
Amendments and corrections
- Dated 19 Oct 2020Group Net Metering and Virtual Net Metering for Renewable Energy (First Amendment) Guidelines, 2020
- Dated 24 Dec 2020Group Net Metering and Virtual Net Metering for Renewable Energy (Second Amendment) Guidelines, 2020
- Dated 28 Sep 2021Group Net Metering and Virtual Net Metering for Renewable Energy (Third Amendment) Guidelines, 2021
- Dated 15 Mar 2024Group Net Metering and Virtual Net Metering for Renewable Energy (Fifth Amendment) Guidelines, 2024
- Dated 5 Jun 2025Group Net Metering and Virtual Net Metering for Renewable Energy (Sixth Amendment) Guidelines, 2025
- Dated 20 Jan 2026Group Net Metering and Virtual Net Metering for Renewable Energy Guidelines, 2019 — Seventh Amendment, 2025
Earlier drafts
- Dated 19 May 2025Group Net Metering and Virtual Net Metering for Renewable Energy Guidelines, 2019 — Sixth Amendment, 2025 — Draft
- Dated 19 May 2025Public notice: Group Net Metering and Virtual Net Metering for Renewable Energy Guidelines, 2019 — Sixth Amendment, 2025 — Public Notice on Draft
- Dated 17 Dec 2025Group Net Metering and Virtual Net Metering for Renewable Energy (Seventh Amendment) Guidelines, 2025 — Draft
- Dated 17 Dec 2025Public notice: Group Net Metering and Virtual Net Metering for Renewable Energy (Seventh Amendment) Guidelines, 2025 — Public Notice
Voltaic last read DERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document DERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.