Summary
Summary written by software. Check the regulator's original before you rely on it.
These are DERC's 2019 Guidelines creating two net-metering frameworks — Group Net Metering (GNM) and Virtual Net Metering (VNM) — layered on top of the DERC (Net Metering for Renewable Energy) Regulations, 2014, and expressed largely by cross-reference to those Regulations and to the 2014 Net Metering Guidelines.
Section 2 defines the two frameworks. GNM lets surplus exported from a renewable system, or from a BESS charged by a renewable system, through a net meter be adjusted across more than one service connection of the *same* consumer, within one distribution licensee's area. VNM lets the entire generation exported from a renewable meter/gross meter be adjusted across multiple *participating* consumers in the same licensee area (p1–2).
Section 3 sets applicability: GNM for all consumers of NCT of Delhi; VNM for residential consumers, group housing societies, government/local authority offices and generators registered under Mukhya Mantri Kisaan Aay Badhotari Yojna. It caps installed capacity between 5 kW and 5,000 kW, allows annual generation to be capped by normative CUF/PLF, addresses SLD charges, network augmentation, land space and who bears capex for the Kisaan Yojna scheme, and directs the licensee to study grid impacts and report within four months (p2–3).
Sections 4–7 route DT-level capacity, application and connectivity, disconnection rights and metering back to the 2014 instruments: a three-tier process (feasibility analysis, registration, connection agreement) with a non-refundable Rs.1,000 application fee, and net-meter cost borne by the consumer on a differential basis (p3–4).
Sections 8 and 9 are the operative additions — billing and energy-accounting rules for GNM and VNM respectively, covering the consumer's priority list for adjustment across connections, once-a-year revision with two months' advance notice, time-block compensation, treatment of surplus as off-peak/normal-block credits, ToD moderation of carried-forward units, and settlement-period carry-forward (p4–6).
Sections 10–17 cover year-end surplus tariff, theft and tampering, dispute resolution, exemption from wheeling/banking/cross-subsidy and other charges for systems commissioned till 31 March 2022, RPO eligibility, REC participation, and the Commission's powers to relax and to amend (p6–7).
Read with this
Read with this: Net Metering for Renewable Energy Regulations, 2014
The regulation
- Dated 2 Sep 2014Net Metering for Renewable Energy Regulations, 2014
Amendments and corrections
- Dated 26 Jul 2024Net Metering for Renewable Energy (First Amendment) Regulations, 2024
- Dated 2 Aug 2024Net Metering for Renewable Energy Regulations, 2014 — First Amendment, 2024
- Dated 1 May 2025Net Metering for Renewable Energy (First Amendment) Guidelines, 2025
- Dated 16 Jul 2026Net Metering for Renewable Energy (Second Amendment) Guidelines, 2026
Procedures and orders made under it
- Dated 24 Jun 2024Peer to Peer Energy Transaction Guidelines, 2024
Proposed changes (drafts with no final yet)
Earlier drafts
- Dated 26 May 2023Net Metering for Renewable Energy (First Amendment) Regulations, 2023 — Draft
- Dated 26 May 2023Public notice: Public Notice for Comments on Draft Net Metering for Renewable Energy (First Amendment) Regulations, 2023
- Dated 2 Jul 2024Net Metering for Renewable Energy (First Amendment) Regulations, 2024 — Draft
- Dated 2 Jul 2024Public notice: Net Metering for Renewable Energy (First Amendment) Regulations, 2024 — consultation notice
Read with this: Group Net Metering and Virtual Net Metering for Renewable Energy Guidelines, 2019
Amendments and corrections
- Dated 19 Oct 2020Group Net Metering and Virtual Net Metering for Renewable Energy (First Amendment) Guidelines, 2020
- Dated 24 Dec 2020Group Net Metering and Virtual Net Metering for Renewable Energy (Second Amendment) Guidelines, 2020
- Dated 28 Sep 2021Group Net Metering and Virtual Net Metering for Renewable Energy (Third Amendment) Guidelines, 2021
- Dated 24 Feb 2022Group Net Metering and Virtual Net Metering for Renewable Energy Guidelines, 2019 — Fourth Amendment, 2022
- Dated 15 Mar 2024Group Net Metering and Virtual Net Metering for Renewable Energy (Fifth Amendment) Guidelines, 2024
- Dated 5 Jun 2025Group Net Metering and Virtual Net Metering for Renewable Energy (Sixth Amendment) Guidelines, 2025
- Dated 20 Jan 2026Group Net Metering and Virtual Net Metering for Renewable Energy Guidelines, 2019 — Seventh Amendment, 2025
Earlier drafts
- Dated 19 May 2025Group Net Metering and Virtual Net Metering for Renewable Energy Guidelines, 2019 — Sixth Amendment, 2025 — Draft
- Dated 19 May 2025Public notice: Group Net Metering and Virtual Net Metering for Renewable Energy Guidelines, 2019 — Sixth Amendment, 2025 — Public Notice on Draft
- Dated 17 Dec 2025Group Net Metering and Virtual Net Metering for Renewable Energy (Seventh Amendment) Guidelines, 2025 — Draft
- Dated 17 Dec 2025Public notice: Group Net Metering and Virtual Net Metering for Renewable Energy (Seventh Amendment) Guidelines, 2025 — Public Notice
Voltaic last read DERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document DERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.