DERC · Delhi Electricity Regulatory Commission
Group Net Metering and Virtual Net Metering for Renewable Energy (Third Amendment) Guidelines, 2021
Delhi Electricity Regulatory Commission (Group Net Metering and Virtual Net Metering for Renewable Energy) (Third Amendment) Guidelines, 2021
AmendmentDated 28 Sep 2021F.3(620)/Tariff-Engg./DERC/2020-21/6846 dated 28/09/2021
Amends the Group Net Metering and Virtual Net Metering for Renewable Energy Guidelines, 2019.
Summary
Summary written by software. Check the regulator's original before you rely on it.
A one-page amendment by the Delhi Electricity Regulatory Commission, dated 28 September 2021, substituting Guideline 3(6) of the DERC (Group Net Metering and Virtual Net Metering for Renewable Energy) Guidelines, 2019 (p1).
The replaced clause had confined the distribution licensee's obligation to bear Service Line cum Development (SLD) and network augmentation capex to projects under the Mukhya Mantri Kisaan Aay Badhotari Yojna implemented up to 31 March 2022, subject to prudence check. The substitute widens that obligation to all schemes under VNM and GNM mode, with the expenditure passed through in Aggregate Revenue Requirement, but caps the SLD waiver by licensee: 75 MW, 50 MW, 30 MW and 10 MW for BRPL, TPDDL, BYPL and NDMC respectively (p1). It adds a quarterly progress-reporting duty covering net metering as well as GNM and VNM, owed to the Commission and to EE&RM, DoP, GoNCTD (p1). It takes effect on the date of uploading on the DERC website; that date is not printed (p1).
Read with this
The regulation
Amendments and corrections
- Dated 19 Oct 2020Group Net Metering and Virtual Net Metering for Renewable Energy (First Amendment) Guidelines, 2020
- Dated 24 Dec 2020Group Net Metering and Virtual Net Metering for Renewable Energy (Second Amendment) Guidelines, 2020
- Dated 24 Feb 2022Group Net Metering and Virtual Net Metering for Renewable Energy Guidelines, 2019 — Fourth Amendment, 2022
- Dated 15 Mar 2024Group Net Metering and Virtual Net Metering for Renewable Energy (Fifth Amendment) Guidelines, 2024
- Dated 5 Jun 2025Group Net Metering and Virtual Net Metering for Renewable Energy (Sixth Amendment) Guidelines, 2025
- Dated 20 Jan 2026Group Net Metering and Virtual Net Metering for Renewable Energy Guidelines, 2019 — Seventh Amendment, 2025
Earlier drafts
- Dated 19 May 2025Group Net Metering and Virtual Net Metering for Renewable Energy Guidelines, 2019 — Sixth Amendment, 2025 — Draft
- Dated 19 May 2025Public notice: Group Net Metering and Virtual Net Metering for Renewable Energy Guidelines, 2019 — Sixth Amendment, 2025 — Public Notice on Draft
- Dated 17 Dec 2025Group Net Metering and Virtual Net Metering for Renewable Energy (Seventh Amendment) Guidelines, 2025 — Draft
- Dated 17 Dec 2025Public notice: Group Net Metering and Virtual Net Metering for Renewable Energy (Seventh Amendment) Guidelines, 2025 — Public Notice
Voltaic last read DERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document DERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.