Explanatory Memorandum on Draft Deviation Settlement Mechanism and Related Matters Regulations, 2025
EXPLANATORY MEMORANDUM ON DRAFT MAHARASHTRA ELECTRICITY REGULATORY COMMISSION (DEVIATION SETTLEMENT MECHANISM AND RELATED MATTERS) REGULATIONS, 2025
Explanatory memorandum to a draftReleased with the notice dated 2 Aug 2025
Draft
Voltaic holds no final regulation made from this draft.
Explanatory memorandum to the draft Deviation Settlement Mechanism and Related Matters Regulations, 2025.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is the Maharashtra Electricity Regulatory Commission's explanatory memorandum for its draft (Deviation Settlement Mechanism and Related Matters) Regulations, 2025, issued in August 2025 (p1). It is a consultation-stage document: it explains why the Commission wants to replace the 2019 state DSM framework and quotes, provision by provision, the text of what it proposes.
Chapter 1 (p4–9) tells the implementation story. It recalls the 2019 Regulations (notified 01 March 2019), the DSM procedure approved on 14 November 2019, the suo motu order of 07.10.2021 that started commercial operation from 11 October 2021, and the run of Removal of Difficulty orders that stretched mock trials and the stabilisation period through 2022. It then summarises the MSPC report submitted on 1 December 2022, CERC's 2022 and 2024 Regulations, and the MERC DSM Working Group's February and July 2025 recommendation that the state align with CERC 2024.
Chapter 2 (p10–14) sets out the national backdrop: the frequency-linked CERC 2014 regime, the market- and ancillary-service-linked 2022 regime and the suo motu orders that capped it, the Expert Committee's recommendations, and the CERC 2024 framework, with a parameter-by-parameter comparison of 2014 and 2024.
Chapter 3 (p15–36) is the core. It covers definitions, objective and applicability, the operating frequency range, the deviation formulas, the normal-rate formula, deviation charges for general sellers, run-of-river stations, standalone storage and infirm power, buyer volume limits and charges, the withdrawal of ADSM charges, the Virtual State Entity, reactive energy, MSLDC fees, payment timelines, MSPC governance and the transition period. Notable proposals: bagasse and biomass plants brought in at 5 MW exportable capacity instead of 25 MW (p17–18); standalone ESS treated as a general seller, with over-drawal in charging mode treated as under-injection (p22–24); co-located ESS left to the 2018 RE DSM Regulations (p17).
Chapter 4 (p37) sets the roadmap — procedures within three months, a mock trial of at least six months, and a phased commercial rollout proposed by April 2026.
Read with this
The regulation
Commencement notices and reasons
Procedures and orders made under it
- Dated 28 Mar 2020Commercial Arrangement under DSM Regulations, 2019 — Removal of Difficulty Order, 2020
- Dated 5 Jun 2020DSM Regulations, 2019 — Removal of Difficulty Order, 2020
- Dated 28 Oct 2020DSM Regulations, 2019 — Removal of Difficulty Order on Commencement of Commercial Arrangement, 2020
- Dated 6 May 2021Removal of Difficulty in implementation of Deviation Settlement Mechanism Regulations, 2019 — Order, 2021
- Dated 7 Oct 2021Commencement of Commercial Arrangement of Deviation Settlement Mechanism Regulations, 2019 — Order, 2021
Proposed changes (drafts with no final yet)
- Released with the notice dated 2 Aug 2025Draft Deviation Settlement Mechanism and Related Matters Regulations, 2025
Voltaic last read MERC's website for final documents on 28 Nov 2026 (8 pages) and for drafts on 28 Nov 2026. A document MERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.