Skip to content

MERC · Maharashtra Electricity Regulatory Commission

Draft Deviation Settlement Mechanism and Related Matters Regulations, 2025

Maharashtra Electricity Regulatory Commission (Deviation Settlement Mechanism and related matters) Regulations, 2025

Draft regulationReleased with the notice dated 2 Aug 2025

Draft

A proposal, not law. Voltaic holds no final regulation made from this draft.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on merc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a draft MERC regulation, dated August 2025, to replace the 2019 state deviation settlement framework for intra-state grid users. The notification cites Electricity Act powers and sets a staged commencement: the bulk of the regulations would commence on Gazette notification, while commercial arrangements, deviation charges and other provisions are deferred to a separate Commission order; until then the 2019 Regulations continue for energy accounting and deviation settlement (p1). Regulation 2 states the grid-discipline objective, and Regulation 3 supplies the pricing and operational definitions, including contract rate, reference charge rate, normal rate, deviation, State Entity and Virtual State Entity (p1–5).

Regulation 4 fixes coverage: general sellers, open access generators, bagasse/biomass plants with exportable capacity of 5 MW or more, non-in-situ captive generators, distribution/deemed distribution licensees and full open access consumers connected to the intra-state transmission system. Wind/solar sellers are routed to the 2018 forecasting and deviation regulations; MSW/RDF plants are deferred; partial open access and distribution-network open access remain under the open access regulations (p5–6).

Regulations 5–9 set the operating scaffolding: SLDC and State Entity duties, metering and scheduling; the time-block scheduling design, merit-order despatch, frequency range and weekly settlement; formulas for seller and buyer deviation; the normal-rate formula; and gaming treatment (p6–10). Regulation 10 then sets the charge matrices for general sellers, run-of-river hydro, wind/solar sellers, standalone storage and buyers, plus buyer volume limits and special cases such as infirm power, start-up power and forced outage (p10–15).

Regulations 11–19 cover the Virtual State Entity and MSLDC ramp instructions, State Energy Account, reactive energy, State Deviation Pool Account, MSLDC fees, payment timelines and letters of credit, and the Maharashtra State Power Committee (p15–22). Regulations 20–23 provide transition, power to relax/remove difficulty, and repeal of the 2019 Regulations with savings (p22–23).

Standard name
DSM Regulations
Primary topics
Deviation settlement (DSM), Scheduling and despatch, Energy accounting and settlement

Read with this

Voltaic last read MERC's website for final documents on 28 Nov 2026 (8 pages) and for drafts on 28 Nov 2026. A document MERC issued after the page that lists it was read may not be held by Voltaic yet.