This is a draft MERC regulation, dated August 2025, to replace the 2019 state deviation settlement framework for intra-state grid users. The notification cites Electricity Act powers and sets a staged commencement: the bulk of the regulations would commence on Gazette notification, while commercial arrangements, deviation charges and other provisions are deferred to a separate Commission order; until then the 2019 Regulations continue for energy accounting and deviation settlement (p1). Regulation 2 states the grid-discipline objective, and Regulation 3 supplies the pricing and operational definitions, including contract rate, reference charge rate, normal rate, deviation, State Entity and Virtual State Entity (p1–5).
Regulation 4 fixes coverage: general sellers, open access generators, bagasse/biomass plants with exportable capacity of 5 MW or more, non-in-situ captive generators, distribution/deemed distribution licensees and full open access consumers connected to the intra-state transmission system. Wind/solar sellers are routed to the 2018 forecasting and deviation regulations; MSW/RDF plants are deferred; partial open access and distribution-network open access remain under the open access regulations (p5–6).
Regulations 5–9 set the operating scaffolding: SLDC and State Entity duties, metering and scheduling; the time-block scheduling design, merit-order despatch, frequency range and weekly settlement; formulas for seller and buyer deviation; the normal-rate formula; and gaming treatment (p6–10). Regulation 10 then sets the charge matrices for general sellers, run-of-river hydro, wind/solar sellers, standalone storage and buyers, plus buyer volume limits and special cases such as infirm power, start-up power and forced outage (p10–15).
Regulations 11–19 cover the Virtual State Entity and MSLDC ramp instructions, State Energy Account, reactive energy, State Deviation Pool Account, MSLDC fees, payment timelines and letters of credit, and the Maharashtra State Power Committee (p15–22). Regulations 20–23 provide transition, power to relax/remove difficulty, and repeal of the 2019 Regulations with savings (p22–23).
Read with this
The regulation
Commencement notices and reasons
Procedures and orders made under it
- Dated 28 Mar 2020Commercial Arrangement under DSM Regulations, 2019 — Removal of Difficulty Order, 2020
- Dated 5 Jun 2020DSM Regulations, 2019 — Removal of Difficulty Order, 2020
- Dated 28 Oct 2020DSM Regulations, 2019 — Removal of Difficulty Order on Commencement of Commercial Arrangement, 2020
- Dated 6 May 2021Removal of Difficulty in implementation of Deviation Settlement Mechanism Regulations, 2019 — Order, 2021
- Dated 7 Oct 2021Commencement of Commercial Arrangement of Deviation Settlement Mechanism Regulations, 2019 — Order, 2021
Proposed changes (drafts with no final yet)
- Released with the notice dated 2 Aug 2025Explanatory memorandum: Explanatory Memorandum on Draft Deviation Settlement Mechanism and Related Matters Regulations, 2025
Voltaic last read MERC's website for final documents on 28 Nov 2026 (8 pages) and for drafts on 28 Nov 2026. A document MERC issued after the page that lists it was read may not be held by Voltaic yet.