CERC · Central Electricity Regulatory Commission
Renewable Energy Tariff Regulations, 2017 — Explanatory Memorandum — Draft
Explanatory Memorandum for Draft Terms and Conditions for Determination of Tariff for Renewable Energy Sources February 2017
Explanatory memorandum to a draftReleased with the notice dated 16 Feb 2017
Draft
The draft has since been finalised as the RE Tariff Regulations, 2017.
Explanatory memorandum to the Renewable Energy Sources Tariff Determination Regulations, 2017 — Draft.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is CERC's explanatory memorandum, dated February 2017, issued with the draft RE tariff regulations for the third control period. It explains why the Commission is revising the 2009 and 2012 RE tariff frameworks, whose control period ends on 31 March 2017, and records stakeholder representations from MNRE and NSEFI (p1, p6–7). It is a rationale and consultation document, not the draft regulations themselves.
Section 2 sets out scope and eligibility. The proposed regulations would apply to RE generating stations or units covered by s.79(1)(a)&(b) read with s.62, and would act as a guiding or ceiling framework for SERCs under the Tariff Policy. Eligibility criteria are proposed for wind, small hydro up to 25 MW, biomass Rankine, non-fossil bagasse cogeneration, solar PV and thermal, biomass gasifier, biogas, MSW and RDF, with most 2012 criteria retained and wind criteria adjusted for taller turbines (p7–10). Section 2.3 explains the consultative and data sources used to set norms (p10–11).
Section 3 covers general principles. It proposes a three-year control period, 2017–2020, while retaining technology-specific tariff periods from 2012; keeps single-part and two-part tariff structures and levellised tariff design; and widens project-specific tariff to solar PV and thermal, wind, biomass gasifier, biogas, MSW/RDF, hybrids and other new technologies, with no annual generic tariff for those (p11–16). It also describes must-run treatment and scheduling/forecasting for RE, including the IEGC and DSM amendments (p16–18).
Section 4 sets financial principles. It explains capital cost benchmarking and a move to annual review or indexation, retention of 70:30 debt-equity, a longer normative loan tenure, interest rates linked to SBI MCLR rather than base rate, revised depreciation and return on equity, working capital norms, O&M escalation, and treatment of subsidy, accelerated depreciation and taxes (p18–26). Section 5 addresses the annual hours basis for CUF/PLF calculations (p26–27).
The technology chapters apply these principles. Small hydro covers capital cost and indexation, CUF, auxiliary consumption and O&M (p27–33). Solar PV and solar thermal are proposed for project-specific capital cost and O&M with CUF and auxiliary norms (p34–37). Wind proposes project-specific capital cost and O&M and reworks CUF by wind zone for 100 m hub heights (p37–43). Biomass Rankine covers capital cost, PLF, auxiliary consumption, station heat rate, GCV, fossil-fuel use, fuel price/indexation and O&M (p43–54). Bagasse cogeneration covers similar norms plus PLF by operating days and bagasse price/indexation (p54–60). Biomass gasifier and biogas cover capital cost net of subsidy, fuel consumption or feedstock price, PLF, auxiliary consumption and O&M (p60–67). Waste-to-energy covers MSW/RDF project-specific capital and O&M and PLF, auxiliary, SHR, calorific value and RDF fuel cost (p68–72). Across these chapters the Commission compares SERC orders and actual project data and generally proposes to retain 2016-17 norms or adjust them for FY 2017-18.
Read with this
The regulation
- Dated 17 Apr 2017RE Tariff Regulations, 2017
Commencement notices and reasons
- Dated 18 Apr 2017RE Tariff Regulations, 2017 — Statement of Reasons
Procedures and orders made under it
- Dated 24 Mar 2020RE Tariff Regulations, 2017 — Extension of Applicability to 30 June 2020
- Date not statedRelated Orders — RE Tariff Regulations, 2017
Other copies of these documents (1)
Earlier drafts
- Dated 16 Feb 2017Renewable Energy Sources Tariff Determination Regulations, 2017 — Draft
- Dated 16 Feb 2017Public notice: Draft RE Tariff Determination Regulations, 2017 — Public Notice