Skip to content

CERC · Central Electricity Regulatory Commission

Related Orders — RE Tariff Regulations, 2017

Related Orders

OrderDate not stated

Replaced by RE Tariff Determination Regulations, 2020

See that regulation for the date it took effect and for anything it keeps in force.

Made under the RE Tariff Regulations, 2017.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The table carries four petition numbers — 05/SM/2017, 02/SM/2018, 1/SM/2019 and 3/SM/2020 — with, for each, the date of the order, the date the order was posted on the website, and a category label (Suo Motu or Misc), together with a file link where one is printed (p1). It exists as a navigation and disclosure aid: it tells a reader which renewable-energy tariff orders exist, when they were passed, and when they became publicly available, rather than setting any substantive norm. A disclaimer states that CERC accepts no liability for actions taken on the basis of the information and invites notice of errors for correction in the next update (p1). No operative provisions, definitions, applicability conditions or enabling provisions appear in the text.

Read with this

The regulation

Commencement notices and reasons

Procedures and orders made under it

Other copies of these documents (1)

Earlier drafts

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document