CERC · Central Electricity Regulatory Commission
RE Tariff Regulations, 2017 — Statement of Reasons
Central Electricity Regulatory Commission (Terms and Conditions for Tariff determination from Renewable Energy Sources) Regulations, 2017
Statement of reasonsDated 18 Apr 2017
Replaced by RE Tariff Determination Regulations, 2020
See that regulation for the date it took effect and for anything it keeps in force.
The commission's reasons for the RE Tariff Regulations, 2017.
Summary
Summary written by software, from pages 1 to 29 of 72. Check the regulator's original before you rely on it.
The document is CERC's Statement of Reasons (SoR) dated 18.04.2017 for the draft Central Electricity Regulatory Commission (Terms and Conditions for Tariff determination from Renewable Energy Sources) Regulations, 2017, made under s.178 of the Electricity Act 2003 for control period 2017-20 (p1). It records comments from 51 stakeholders on the draft and the Commission's section-by-section response.
On definitions and eligibility, the Commission declines a separate wind-solar hybrid definition, treating hybrids under 'other hybrid projects' in Regulation 7(a), retains the MNRE 25 MW ceiling for renewable hydro for the control period, and fixes SHP useful life at 35 years (p2-3). It removes '(only for zoning purpose)' from the wind eligibility criterion and retains the non-fossil co-generation topping-cycle definition (p4-5).
The SoR confirms a three-year control period beginning FY2017-18, rejecting requests for five years (p5). It makes a major change to the draft: tariff period is now equal to the useful life of the plant, abandoning the technology-specific periods in the draft (p5-7). Generic tariff is discontinued for solar, wind and other listed technologies; project-specific tariff is available, and the SoR leaves small-scale generic tariff to SERCs (p7-11).
Later sections deal with petitions and forms (p11-12), tariff structure and design (single-part, or two-component for fuel-based technologies; levellised with post-tax WACC and MAT gross-up) (p12-14), and despatch: most RE is 'must run', with biomass of 10 MW and above and non-fossil co-generation subject to IEGC/DSM scheduling; deemed generation is not accepted, but NLDC is asked to work on written reasons for backdown (p14-18).
Financial norms are then discussed: capital cost includes evacuation to the interconnection point (p18-19); loan tenure, MCLR-linked interest, depreciation, 14% ROE grossed up by MAT, working-capital interest, rebate and CDM sharing (p19-28). Section 17, on subsidy/incentive and accelerated depreciation, begins at p28. The supplied text covers only pages 1-29 of 72; later technology-specific chapters are not available.
Read with this
The regulation
- Dated 17 Apr 2017RE Tariff Regulations, 2017
Procedures and orders made under it
- Dated 24 Mar 2020RE Tariff Regulations, 2017 — Extension of Applicability to 30 June 2020
- Date not statedRelated Orders — RE Tariff Regulations, 2017
Other copies of these documents (1)
Earlier drafts
- Dated 16 Feb 2017Renewable Energy Sources Tariff Determination Regulations, 2017 — Draft
- Released with the notice dated 16 Feb 2017Explanatory memorandum: Renewable Energy Tariff Regulations, 2017 — Explanatory Memorandum — Draft
- Dated 16 Feb 2017Public notice: Draft RE Tariff Determination Regulations, 2017 — Public Notice
Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.