Skip to content

CERC · Central Electricity Regulatory Commission

RE Tariff Regulations, 2017 — Statement of Reasons

Central Electricity Regulatory Commission (Terms and Conditions for Tariff determination from Renewable Energy Sources) Regulations, 2017

Statement of reasonsDated 18 Apr 2017

Replaced by RE Tariff Determination Regulations, 2020

See that regulation for the date it took effect and for anything it keeps in force.

The commission's reasons for the RE Tariff Regulations, 2017.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software, from pages 1 to 29 of 72. Check the regulator's original before you rely on it.

The document is CERC's Statement of Reasons (SoR) dated 18.04.2017 for the draft Central Electricity Regulatory Commission (Terms and Conditions for Tariff determination from Renewable Energy Sources) Regulations, 2017, made under s.178 of the Electricity Act 2003 for control period 2017-20 (p1). It records comments from 51 stakeholders on the draft and the Commission's section-by-section response.

On definitions and eligibility, the Commission declines a separate wind-solar hybrid definition, treating hybrids under 'other hybrid projects' in Regulation 7(a), retains the MNRE 25 MW ceiling for renewable hydro for the control period, and fixes SHP useful life at 35 years (p2-3). It removes '(only for zoning purpose)' from the wind eligibility criterion and retains the non-fossil co-generation topping-cycle definition (p4-5).

The SoR confirms a three-year control period beginning FY2017-18, rejecting requests for five years (p5). It makes a major change to the draft: tariff period is now equal to the useful life of the plant, abandoning the technology-specific periods in the draft (p5-7). Generic tariff is discontinued for solar, wind and other listed technologies; project-specific tariff is available, and the SoR leaves small-scale generic tariff to SERCs (p7-11).

Later sections deal with petitions and forms (p11-12), tariff structure and design (single-part, or two-component for fuel-based technologies; levellised with post-tax WACC and MAT gross-up) (p12-14), and despatch: most RE is 'must run', with biomass of 10 MW and above and non-fossil co-generation subject to IEGC/DSM scheduling; deemed generation is not accepted, but NLDC is asked to work on written reasons for backdown (p14-18).

Financial norms are then discussed: capital cost includes evacuation to the interconnection point (p18-19); loan tenure, MCLR-linked interest, depreciation, 14% ROE grossed up by MAT, working-capital interest, rebate and CDM sharing (p19-28). Section 17, on subsidy/incentive and accelerated depreciation, begins at p28. The supplied text covers only pages 1-29 of 72; later technology-specific chapters are not available.

Standard name
Renewable Energy Tariff Regulations
Primary topics
Renewable energy tariff, Tariff determination, Capital cost and investment

Read with this

The regulation

Procedures and orders made under it

Other copies of these documents (1)

Earlier drafts

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document