Renewable Energy Sources Tariff Determination Regulations, 2017 — Draft

Central Electricity Regulatory Commission (Terms and Conditions for Tariff determination from Renewable Energy Sources) Regulations, 2017

Draft regulationDated 16 Feb 2017No.:1/21/2017-Reg.Aff./(RE-Tariff - 2017-20)/CERC dated 16th February 2017

Draft

A proposal that has since been finalised as the RE Tariff Regulations, 2017.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The Central Electricity Regulatory Commission issued this notification on 16 February 2017 to make the CERC (Terms and Conditions for Tariff determination from Renewable Energy Sources) Regulations, 2017 (p1). The regulations come into force on 1 April 2017 and remain in force for three years unless reviewed earlier or extended by the Commission; the control period is three years, beginning with FY 2017-18 (p1, p8). Tariff determined for projects commissioned during the control period continues for the applicable tariff period, and if the next control period's regulations are not notified, existing norms continue subject to later adjustments (pp8–9).

Regulations 1–4 set the short title, commencement, definitions of renewable energy technologies and project terms, scope, and technology-wise eligibility criteria (pp1–8). The definitions cover sources such as wind, small hydro, biomass, biogas, solar PV, solar thermal, MSW and RDF, and set out useful life by technology (pp2–5). The scope applies to generating stations whose tariff CERC determines under Section 62 read with Section 79, subject to the eligibility criteria in Regulation 4 (p6).

Chapter 1 lays down general principles (pp8–13): the control period and tariff period, the list of technologies eligible for project-specific tariff, the petition and proceedings route for tariff determination, the single-part tariff structure (with a two-part structure for fuel-based technologies), levellised tariff design, and despatch principles, including must-run treatment for most renewable plants and scheduling/despatch obligations for larger biomass and non-fossil cogeneration plants.

Chapter 2 sets the financial principles (pp14–19): capital cost and indexation, debt-equity ratio, loan tenure and interest rate, depreciation, return on equity, working capital, the hours basis for CUF/PLF, O&M expenses and escalation, rebate, late-payment surcharge, sharing of CDM benefits, treatment of subsidy or incentive, and taxes and duties.

Chapters 3 to 11 give technology-specific parameters for wind, small hydro, biomass Rankine, non-fossil fuel cogeneration, solar PV, solar thermal, biomass gasifier, biogas, and MSW/RDF projects (pp20–40). Each chapter specifies the applicable capital-cost approach, capacity utilisation or plant load factor, auxiliary consumption, station heat rate where relevant, O&M expenses, fuel mix, fossil-fuel monitoring, calorific value and fuel cost, or directs project-specific determination. Chapter 12 contains miscellaneous provisions for deviation from norms and the Commission's power to relax (p41). The appended forms provide templates for project information and tariff computation (pp42–46).

Standard name
Renewable Energy Tariff Regulations
Primary topics
Renewable energy tariff, Tariff determination, Multi Year Tariff (MYT)

Read with this

The regulation

Commencement notices and reasons

Procedures and orders made under it

Other copies of these documents (1)

Earlier drafts

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗