CERC · Central Electricity Regulatory Commission
RE Tariff Regulations, 2017
Central Electricity Regulatory Commission (Terms and Conditions for Tariff determination from Renewable Energy Sources) Regulations, 2017
RegulationDated 17 Apr 2017In force from 1 Apr 2017No.: 1/21/2017-Reg.Aff./(RE-Tariff - 2017-20)/CERC dated 17th April 2017
Replaced by RE Tariff Determination Regulations, 2020
See that regulation for the date it took effect and for anything it keeps in force.
Summary
Summary written by software. Check the regulator's original before you rely on it.
The CERC (Terms and Conditions for Tariff determination from Renewable Energy Sources) Regulations, 2017 is a principal CERC regulation notified on 17 April 2017 and brought into force from 1 April 2017, to remain in force for three years unless reviewed earlier or extended (p1). It applies where the Commission determines tariff under section 62 read with section 79 of the Electricity Act, 2003 for renewable generating stations or units commissioned during the Control Period, subject to technology-specific eligibility criteria (p6).
The opening regulations set definitions and eligibility: wind using new turbines at approved sites; small hydro up to 25 MW at a single location using new plant; biomass Rankine cycle without fossil fuel; non-fossil cogeneration meeting a topping-cycle qualifying requirement; MNRE-approved solar PV/thermal; biomass gasifier with 100% producer gas engine; biogas with 100% biogas engine; and MSW/RDF projects using new plant and Rankine cycle technology (pp3, 6-8).
Chapter 1 (pp9-13) sets general principles: a three-year Control Period with FY 2017-18 as the first year; tariff period equal to useful life from COD; project-specific tariff on a case-to-case basis for solar PV/thermal, wind, MSW/RDF, hybrids and opted biomass gasifier/biogas projects, with no annual generic tariff for those; petition and proceedings requirements; single-part tariff (two components for fuel-based technologies); levellised tariff computation; and despatch treatment - most RE plants are must-run except biomass of 10 MW and above and non-fossil cogeneration, which are scheduled under IEGC and DSM regulations (pp9-13).
Chapter 2 (pp14-19) contains financial principles: capital cost scope, debt-equity ratio, loan tenure and interest rate, depreciation, return on equity, interest on working capital, CUF/PLF hours, O&M expenses and escalation, rebates, late payment surcharge, sharing of CDM benefits, treatment of central/state subsidies and accelerated depreciation, and taxes/duties pass-through (pp14-19).
Chapters 3 to 11 (pp20-39) provide technology-specific parameter norms for wind, small hydro, biomass Rankine, non-fossil cogeneration, solar PV, solar thermal, biomass gasifier, biogas, and MSW/RDF projects, covering where applicable capital cost, CUF/PLF, auxiliary consumption, station heat rate, O&M expenses, fuel mix, fossil-fuel use and monitoring, calorific value, and fuel/feedstock prices (pp20-39). Chapter 12 (p40) allows tariff by agreement below the levellised normative tariff and gives the Commission power to relax provisions. The Appendix (pp41-45) prescribes forms for tariff petitions and tariff-component computation.
Read with this
Commencement notices and reasons
- Dated 18 Apr 2017RE Tariff Regulations, 2017 — Statement of Reasons
Procedures and orders made under it
- Dated 24 Mar 2020RE Tariff Regulations, 2017 — Extension of Applicability to 30 June 2020
- Date not statedRelated Orders — RE Tariff Regulations, 2017
Other copies of these documents (1)
Earlier drafts
- Dated 16 Feb 2017Renewable Energy Sources Tariff Determination Regulations, 2017 — Draft
- Released with the notice dated 16 Feb 2017Explanatory memorandum: Renewable Energy Tariff Regulations, 2017 — Explanatory Memorandum — Draft
- Dated 16 Feb 2017Public notice: Draft RE Tariff Determination Regulations, 2017 — Public Notice
Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.