CERC · Central Electricity Regulatory Commission

RE Tariff Regulations, 2017

Central Electricity Regulatory Commission (Terms and Conditions for Tariff determination from Renewable Energy Sources) Regulations, 2017

RegulationDated 17 Apr 2017In force from 1 Apr 2017No.: 1/21/2017-Reg.Aff./(RE-Tariff - 2017-20)/CERC dated 17th April 2017

Replaced by RE Tariff Determination Regulations, 2020

See that regulation for the date it took effect and for anything it keeps in force.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The CERC (Terms and Conditions for Tariff determination from Renewable Energy Sources) Regulations, 2017 is a principal CERC regulation notified on 17 April 2017 and brought into force from 1 April 2017, to remain in force for three years unless reviewed earlier or extended (p1). It applies where the Commission determines tariff under section 62 read with section 79 of the Electricity Act, 2003 for renewable generating stations or units commissioned during the Control Period, subject to technology-specific eligibility criteria (p6).

The opening regulations set definitions and eligibility: wind using new turbines at approved sites; small hydro up to 25 MW at a single location using new plant; biomass Rankine cycle without fossil fuel; non-fossil cogeneration meeting a topping-cycle qualifying requirement; MNRE-approved solar PV/thermal; biomass gasifier with 100% producer gas engine; biogas with 100% biogas engine; and MSW/RDF projects using new plant and Rankine cycle technology (pp3, 6-8).

Chapter 1 (pp9-13) sets general principles: a three-year Control Period with FY 2017-18 as the first year; tariff period equal to useful life from COD; project-specific tariff on a case-to-case basis for solar PV/thermal, wind, MSW/RDF, hybrids and opted biomass gasifier/biogas projects, with no annual generic tariff for those; petition and proceedings requirements; single-part tariff (two components for fuel-based technologies); levellised tariff computation; and despatch treatment - most RE plants are must-run except biomass of 10 MW and above and non-fossil cogeneration, which are scheduled under IEGC and DSM regulations (pp9-13).

Chapter 2 (pp14-19) contains financial principles: capital cost scope, debt-equity ratio, loan tenure and interest rate, depreciation, return on equity, interest on working capital, CUF/PLF hours, O&M expenses and escalation, rebates, late payment surcharge, sharing of CDM benefits, treatment of central/state subsidies and accelerated depreciation, and taxes/duties pass-through (pp14-19).

Chapters 3 to 11 (pp20-39) provide technology-specific parameter norms for wind, small hydro, biomass Rankine, non-fossil cogeneration, solar PV, solar thermal, biomass gasifier, biogas, and MSW/RDF projects, covering where applicable capital cost, CUF/PLF, auxiliary consumption, station heat rate, O&M expenses, fuel mix, fossil-fuel use and monitoring, calorific value, and fuel/feedstock prices (pp20-39). Chapter 12 (p40) allows tariff by agreement below the levellised normative tariff and gives the Commission power to relax provisions. The Appendix (pp41-45) prescribes forms for tariff petitions and tariff-component computation.

Standard name
Renewable Energy Tariff Regulations
Primary topics
Renewable energy tariff, Tariff determination, Multi Year Tariff (MYT)

Read with this

Commencement notices and reasons

Procedures and orders made under it

Other copies of these documents (1)

Earlier drafts

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗