RE Tariff Determination Regulations, 2024

Central Electricity Regulatory Commission (Terms and Conditions for Tariff determination from Renewable Energy Sources) Regulations, 2024

Regulation · Gazette copyDated 12 Jun 2024Published in the Gazette 16 Jul 2024In force from 1 Jul 2024No. RA-14026(11)/1/2023-CERC dated 12th June, 2024

The Gazette copy of the Renewable Energy Tariff Regulations, 2024.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The Central Electricity Regulatory Commission (Terms and Conditions for Tariff determination from Renewable Energy Sources) Regulations, 2024 is a principal CERC regulation, notified as No. RA-14026(11)/1/2023-CERC and signed at New Delhi on 12 June 2024 (p28). The gazette header shows publication on 16 July 2024 as an Extraordinary Part III Section 4 notification (p1). It is made under s.61 read with s.178(2)(s) of the Electricity Act 2003 (p28). It comes into force on 01.07.2024 and remains in force until 31.03.2027 unless reviewed earlier or extended (p28). It applies where CERC determines tariff under s.62 read with s.79 for grid-connected renewable energy generating stations or units commissioned during the Control Period, subject to technology-specific eligibility criteria (pp30-31). The first Control Period year runs from 01.07.2024 to 31.03.2025 (p32).

Regulations 1-4 set the short title, commencement, definitions, scope and eligibility for wind, small hydro, biomass Rankine, non-fossil fuel cogeneration, solar PV, floating solar, solar thermal, renewable hybrid, RE with storage, biomass gasifier, biogas, municipal solid waste and refuse-derived-fuel projects (pp28-31). Chapter 1 (Regulations 5-11) sets general principles: the control period, annual generic tariffs for specified technologies, project-specific tariffs for solar, wind, hybrid and storage projects, the petition and proceedings route, tariff structure and levelized tariff design, and treatment of over-generation (pp31-33).

Chapter 2 (Regulations 12-23) sets the financial principles for both generic and project-specific tariffs: capital cost, debt-equity, loan tenure and interest, depreciation, return on equity, working capital, capacity utilisation/plant load factor hours, O&M expenses, rebate, late payment surcharge, subsidy and incentive treatment, and statutory charges (pp33-36).

Chapters 3-12 (Regulations 24-74) give technology-specific parameters — capital cost, CUF/PLF, auxiliary consumption, station heat rate, gross calorific value, fuel cost and O&M — for wind, small hydro, biomass Rankine, non-fossil fuel cogeneration, solar PV/floating/solar thermal, biomass gasifier, biogas, RDF-based MSW, renewable hybrid and RE with storage (pp36-42). Chapter 13 (Regulations 75-77) permits deviation by agreement subject to a levelized ceiling and gives the Commission powers to relax provisions and remove difficulties (p42). The Appendix contains the petition forms and tariff-computation templates, Forms 1.1, 1.2, 2.1, 2.2 and 2.3 (pp42-49).

Standard name
Renewable Energy Tariff Regulations
Primary topics
Renewable energy tariff, Tariff determination, Capital cost and investment

Read with this

The regulation

Commencement notices and reasons

Earlier drafts

3 more documents belong here and are not on Voltaic: 2 drafts or notices on a draft not held as English text and 1 draft or notice on a draft.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗