CERC · Central Electricity Regulatory Commission
Draft RE Tariff Regulations, 2024 — Explanatory Memorandum
Explanatory Memorandum On Draft Central Electricity Regulatory Commission (Terms and Conditions for Tariff Determination from Renewable Energy Sources) Regulations, 2024
Explanatory memorandum to a draftReleased with the notice dated 17 Feb 2024
Draft
The draft has since been finalised as the Renewable Energy Tariff Regulations, 2024.
Explanatory memorandum to the Renewable Energy Tariff Determination Regulations, 2024 — Draft.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is CERC's Explanatory Memorandum (February 2024, p1) accompanying the draft CERC (Terms and Conditions for Tariff Determination from Renewable Energy Sources) Regulations, 2024. It is a rationale document, not the regulation itself: for each proposed norm it quotes the corresponding provision of the CERC RE Tariff Regulations, 2020, reviews how State Electricity Regulatory Commissions, lenders and actual projects have treated the same parameter, and then states what the Commission proposes for the next Control Period (p14–16).
The Background (p11–13) sets out CERC's statutory mandate, lists the RE tariff regulations issued since 2009 and their control periods, records that the 2020 regulations' applicability was extended to 31 March 2024, and explains why fresh norms are needed from 1 April 2024. It describes the data-gathering exercise — cost and performance data from IREDA and SECI, meetings with biomass and MSW developer associations and consultation with MOHUA.
The Scope chapter (p14–16) covers applicability under Sections 79 and 62, retention of the 2020 eligibility criteria, a new threshold for recognising a renewable hybrid project (a project qualifies only where one renewable technology is at least 33% of total capacity and both operate at the same point of interconnection, p14–15), and the consultative approach used to develop the norms.
The General Principles (p17–23) propose the control period, tariff period equal to useful life (with special treatment for MSW/RDF, hybrid and storage projects), the split between generic and project-specific tariffs, the suo-motu and project-specific petition process including a beneficiary-consent requirement, continuation of the single-part / two-part levellised tariff design, and new provisions for treatment of over-generation modelled on the Ministry of Power competitive-bidding guidelines.
The Financial Principles (p24–34) work through normative debt-equity, loan tenure and interest rate, a 'differential depreciation' approach, return on equity (with a higher rate for small hydro), interest on working capital, O&M escalation derived from WPI/CPI, rebate and late payment surcharge tied to the MoP LPS Rules 2022, treatment of government subsidy or incentive, and pass-through of statutory charges.
The Technology Specific Parameters chapter (p35–81) runs technology by technology — wind (including offshore), small hydro, biomass Rankine, non-fossil cogeneration, solar PV/thermal/floating, biomass gasifier, biogas, MSW/RDF, renewable hybrid and RE with storage — each covering capital cost, performance parameters and, where applicable, fuel price and O&M norms, with the capital-cost and fuel-cost indexation methodologies set out along the way.
Read with this
The regulation
- Dated 12 Jun 2024Renewable Energy Tariff Regulations, 2024
Commencement notices and reasons
- Dated 17 Sep 2024RE Tariff Regulations, 2024 — Statement of Reasons
Procedures and orders made under it
Other copies of these documents (1)
- Dated 12 Jun 2024RE Tariff Determination Regulations, 2024
Earlier drafts
- Dated 17 Feb 2024Renewable Energy Tariff Determination Regulations, 2024 — Draft
- Dated 17 Feb 2024Public notice: Draft Terms and Conditions for Tariff Determination from Renewable Energy Sources Regulations, 2024 — Public Notice
3 more documents belong here and are not on Voltaic: 2 drafts or notices on a draft not held as English text and 1 draft or notice on a draft.
Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.