Skip to content

CERC · Central Electricity Regulatory Commission

Renewable Energy Tariff Regulations, 2024

Central Electricity Regulatory Commission (Terms and Conditions for Tariff determination from Renewable Energy Sources) Regulations, 2024

RegulationDated 12 Jun 2024In force from 1 Jul 2024No.: RA-14026(11)/1/2023-CERC dated 12th June, 2024

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the CERC regulation that governs how tariffs are determined for grid-connected renewable energy generating stations whose tariff the Commission fixes under Section 62 read with Section 79 of the Electricity Act, 2003 (p6). It was issued on 12 June 2024, comes into force on 1 July 2024, and stays in force until 31 March 2027 unless reviewed earlier — the same window is declared as the Control Period (p1, p9).

The opening pages define the technologies in scope — wind, small hydro, biomass (Rankine cycle and gasifier), biogas, non-fossil-fuel co-generation, solar PV, floating solar, solar thermal, municipal solid waste and RDF-based projects, renewable hybrid and renewable-energy-with-storage projects — and set eligibility tests for each, including that a renewable hybrid project must draw at least 33% of installed capacity from one renewable source, and that small hydro covers projects up to 25 MW (p4, p6–9).

Chapter 1 (Regs 5–11) sets out general principles: the Control Period, which project types get a generic tariff determined annually by the Commission versus a project-specific tariff on petition, the documents and fee a tariff petition must carry, the tariff structure and its levelisation basis, and treatment of excess generation (p9–13). Chapter 2 (Regs 12–23) lays down the financial principles — capital cost scope, debt-equity ratio, loan tenure and interest, depreciation, return on equity, working capital, capacity-utilisation-factor convention, O&M expenses and escalation, rebate, late payment surcharge, treatment of subsidy/incentives and statutory charges (p13–18).

Chapters 3 to 12 then set the technology-specific parameters for each RE category in turn: wind, small hydro, biomass Rankine, co-generation, solar (PV, thermal, floating), biomass gasifier, biogas, RDF-MSW, renewable hybrid and RE-with-storage — specifying which parameters are normative as against project-specific, and the norms for capital cost, capacity utilisation factor or plant load factor, auxiliary consumption, heat rate, specific fuel consumption, gross calorific value, fuel price, O&M and, where relevant, storage efficiency and composite tariff (p18–30). Chapter 13 (Regs 75–77) permits deviation by agreement subject to the levelised normative tariff as a ceiling, and gives the Commission powers to relax provisions and to remove difficulties (p31).

The Appendix supplies the standard forms a developer or licensee must file — assumption templates and multi-year levelised tariff computation formats, including a 40-year format for small hydro (p32–41).

Standard name
Renewable Energy Tariff Regulations
Primary topics
Renewable energy tariff, Tariff determination, Generation tariff

Read with this

Commencement notices and reasons

Other copies of these documents (1)

Earlier drafts

3 more documents belong here and are not on Voltaic: 2 drafts or notices on a draft not held as English text and 1 draft or notice on a draft.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

As of its reading of CERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document