Skip to content

CERC · Central Electricity Regulatory Commission

RE Tariff Regulations, 2024 — Statement of Reasons

Central Electricity Regulatory Commission (Terms and Conditions for Tariff Determination from Renewable Energy Sources) Regulations, 2024, applicable from 01.07.2024 – Statement of Objects & Reasons (SOR) thereof.

Statement of reasonsDated 17 Sep 2024Published in the Gazette 12 Jun 2024No. RA-14026(11)/1/2023-CERC dated 17/09/2024

The commission's reasons for the Renewable Energy Tariff Regulations, 2024.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software, from pages 1 to 31 of 75. Check the regulator's original before you rely on it.

This is the Statement of Reasons (SoR) issued by CERC on 17/09/2024 for the CERC (Terms and Conditions for Tariff Determination from Renewable Energy Sources) Regulations, 2024. The Regulations were notified on 12/06/2024 and are stated as applicable from 01/07/2024, with a control period from 01/04/2024 to 31/03/2027 (p1–2, p12). The SoR explains how CERC dealt with stakeholder comments on the Draft Regulations published on 17/02/2024, for which a public hearing was held on 19/03/2024 and 42 stakeholders submitted comments (p1). It is not the operative regulation; it reproduces proposed clauses, summarises comments, and records the Commission's analysis and modified final clause text.

The pages cover the Introduction (p1–2) and sections 1–15. Section 1 disposes of comments on definitions: biomass is widened to include wastes recognised by the Central Government, while definitions of project, renewable energy source, renewable hybrid energy project, small hydro project, State Nodal Agency, storage and useful life are retained, with a useful-life table by technology (p2–9). Sections 2–3 address scope, eligibility and control period, confirming CERC's Section 62/Section 79 jurisdiction and modifying the control-period proviso to allow conditions if norms continue beyond 31/03/2027 (p9–13). Sections 4–6 cover generic tariff (restricted to RDF-based municipal solid waste projects), project-specific tariff (extended to biomass projects), and petition requirements, including exemption from beneficiary consent where Central or State schemes exempt it (p13–18). Sections 7–8 deal with tariff design and over-generation, permitting sale in the market under bilateral or collective transactions while preserving the beneficiary's first right of refusal (p18–22). Sections 9–15 explain capital cost benchmarking, loan tenure and interest, depreciation, return on equity, working capital interest, CUF/PLF calculation and O&M escalation, largely retaining the draft norms with limited changes such as a higher small-hydro RoE (p22–31).

Standard name
Renewable Energy Tariff Regulations
Primary topics
Tariff determination, Renewable energy tariff, Multi Year Tariff (MYT)

Read with this

The regulation

Other copies of these documents (1)

Earlier drafts

3 more documents belong here and are not on Voltaic: 2 drafts or notices on a draft not held as English text and 1 draft or notice on a draft.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document