RE Tariff Regulations, 2024 — Statement of Reasons
Central Electricity Regulatory Commission (Terms and Conditions for Tariff Determination from Renewable Energy Sources) Regulations, 2024, applicable from 01.07.2024 – Statement of Objects & Reasons (SOR) thereof.
Statement of reasonsDated 17 Sep 2024Published in the Gazette 12 Jun 2024No. RA-14026(11)/1/2023-CERC dated 17/09/2024
The commission's reasons for the Renewable Energy Tariff Regulations, 2024.
Summary
Summary written by software, from pages 1 to 31 of 75. Check the regulator's original before you rely on it.
This is the Statement of Reasons (SoR) issued by CERC on 17/09/2024 for the CERC (Terms and Conditions for Tariff Determination from Renewable Energy Sources) Regulations, 2024. The Regulations were notified on 12/06/2024 and are stated as applicable from 01/07/2024, with a control period from 01/04/2024 to 31/03/2027 (p1–2, p12). The SoR explains how CERC dealt with stakeholder comments on the Draft Regulations published on 17/02/2024, for which a public hearing was held on 19/03/2024 and 42 stakeholders submitted comments (p1). It is not the operative regulation; it reproduces proposed clauses, summarises comments, and records the Commission's analysis and modified final clause text.
The pages cover the Introduction (p1–2) and sections 1–15. Section 1 disposes of comments on definitions: biomass is widened to include wastes recognised by the Central Government, while definitions of project, renewable energy source, renewable hybrid energy project, small hydro project, State Nodal Agency, storage and useful life are retained, with a useful-life table by technology (p2–9). Sections 2–3 address scope, eligibility and control period, confirming CERC's Section 62/Section 79 jurisdiction and modifying the control-period proviso to allow conditions if norms continue beyond 31/03/2027 (p9–13). Sections 4–6 cover generic tariff (restricted to RDF-based municipal solid waste projects), project-specific tariff (extended to biomass projects), and petition requirements, including exemption from beneficiary consent where Central or State schemes exempt it (p13–18). Sections 7–8 deal with tariff design and over-generation, permitting sale in the market under bilateral or collective transactions while preserving the beneficiary's first right of refusal (p18–22). Sections 9–15 explain capital cost benchmarking, loan tenure and interest, depreciation, return on equity, working capital interest, CUF/PLF calculation and O&M escalation, largely retaining the draft norms with limited changes such as a higher small-hydro RoE (p22–31).
Read with this
The regulation
- Dated 12 Jun 2024Renewable Energy Tariff Regulations, 2024
Procedures and orders made under it
Other copies of these documents (1)
- Dated 12 Jun 2024RE Tariff Determination Regulations, 2024
Earlier drafts
- Dated 17 Feb 2024Renewable Energy Tariff Determination Regulations, 2024 — Draft
- Dated 17 Feb 2024Public notice: Draft Terms and Conditions for Tariff Determination from Renewable Energy Sources Regulations, 2024 — Public Notice
- Released with the notice dated 17 Feb 2024Explanatory memorandum: Draft RE Tariff Regulations, 2024 — Explanatory Memorandum
3 more documents belong here and are not on Voltaic: 2 drafts or notices on a draft not held as English text and 1 draft or notice on a draft.
Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.