Skip to content

CERC · Central Electricity Regulatory Commission

Levellised Generic Tariff for Renewable Energy, FY 2025-26 — Second Year of Control Period under RE Tariff Regulations, 2024

Determination of levellised generic tariff for second year of the Control Period (for FY 2025-2026) under Regulation 8 of the Central Electricity Regulatory Commission (Terms and Conditions for Tariff determination from Renewable Energy Sources) Regulations, 2024.

OrderDated 9 Jul 2025Petition No. 06/SM/2025 (Suo-Motu) dated 9 th July, 2025

Made under the Renewable Energy Tariff Regulations, 2024.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software, from pages 1 to 35 of 239. Check the regulator's original before you rely on it.

This is CERC's suo motu order in Petition No. 06/SM/2025 dated 9 July 2025, determining levellised generic tariffs for the second year of the 2024–27 renewable-energy control period, i.e. FY 2025-26 (p1–2). The main order (pp1–8) records that the RE Tariff Regulations, 2024 were notified on 12.06.2024 and that Regulation 8(1) requires generic tariffs to be fixed before each control-period year. It summarises comments received on a public notice of 11.06.2025 and the Commission's decisions: it declines to change the normative CUF or capital cost for small hydro in Odisha, the bagasse fuel price for Tamil Nadu or the escalation rate, and the RDF/MSW fuel-cost treatment, saying those are matters for amendment of the RE Tariff Regulations 2024 rather than this tariff exercise (pp3–8).

Annexure-I (pp9–33) is the operative tariff annexure. Sections A–R restate the regulatory basis and parameters used: useful life, control period, tariff structure and design, levellised tariff and discount factor, capital cost norms, debt-equity, return on equity, loan tenure and interest, depreciation, working capital, O&M expenses, CUF/PLF, auxiliary consumption, station heat rate, fuel mix/calorific value/fuel prices, and subsidy or accelerated-depreciation treatment (pp9–25). It then publishes technology- and state-wise generic tariff tables for small hydro, biomass Rankine cycle (with water/air-cooled condensers, travelling-grate/AFBC boilers, and rice-straw or juliflora variants), non-fossil cogeneration, biomass gasifier, biogas and RDF/MSW, showing fixed and variable cost components for fuel-based technologies and accelerated-depreciation adjustments (pp25–30). An annexure index lists the detailed computation annexures 1A–1H, 2.1A–2.8I, 3A–3H, 4A–4I, 5 and 6 (pp30–33). Only the first computation annexure, Annexure 1A for SHP below 5 MW in Himachal Pradesh, Uttarakhand, West Bengal, J&K, Ladakh and NE States, is supplied, showing assumptions and a year-wise fixed-cost build-up (pp34–35).

Standard name
Renewable Energy Tariff Regulations
Primary topics
Renewable energy tariff, Tariff determination, Capital cost and investment

Read with this

The regulation

Commencement notices and reasons

Other copies of these documents (1)

Earlier drafts

3 more documents belong here and are not on Voltaic: 2 drafts or notices on a draft not held as English text and 1 draft or notice on a draft.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document