CERC · Central Electricity Regulatory Commission
Levellised Generic Tariff for Renewable Energy, FY 2025-26 — Second Year of Control Period under RE Tariff Regulations, 2024
Determination of levellised generic tariff for second year of the Control Period (for FY 2025-2026) under Regulation 8 of the Central Electricity Regulatory Commission (Terms and Conditions for Tariff determination from Renewable Energy Sources) Regulations, 2024.
OrderDated 9 Jul 2025Petition No. 06/SM/2025 (Suo-Motu) dated 9 th July, 2025
Made under the Renewable Energy Tariff Regulations, 2024.
Summary
Summary written by software, from pages 1 to 35 of 239. Check the regulator's original before you rely on it.
This is CERC's suo motu order in Petition No. 06/SM/2025 dated 9 July 2025, determining levellised generic tariffs for the second year of the 2024–27 renewable-energy control period, i.e. FY 2025-26 (p1–2). The main order (pp1–8) records that the RE Tariff Regulations, 2024 were notified on 12.06.2024 and that Regulation 8(1) requires generic tariffs to be fixed before each control-period year. It summarises comments received on a public notice of 11.06.2025 and the Commission's decisions: it declines to change the normative CUF or capital cost for small hydro in Odisha, the bagasse fuel price for Tamil Nadu or the escalation rate, and the RDF/MSW fuel-cost treatment, saying those are matters for amendment of the RE Tariff Regulations 2024 rather than this tariff exercise (pp3–8).
Annexure-I (pp9–33) is the operative tariff annexure. Sections A–R restate the regulatory basis and parameters used: useful life, control period, tariff structure and design, levellised tariff and discount factor, capital cost norms, debt-equity, return on equity, loan tenure and interest, depreciation, working capital, O&M expenses, CUF/PLF, auxiliary consumption, station heat rate, fuel mix/calorific value/fuel prices, and subsidy or accelerated-depreciation treatment (pp9–25). It then publishes technology- and state-wise generic tariff tables for small hydro, biomass Rankine cycle (with water/air-cooled condensers, travelling-grate/AFBC boilers, and rice-straw or juliflora variants), non-fossil cogeneration, biomass gasifier, biogas and RDF/MSW, showing fixed and variable cost components for fuel-based technologies and accelerated-depreciation adjustments (pp25–30). An annexure index lists the detailed computation annexures 1A–1H, 2.1A–2.8I, 3A–3H, 4A–4I, 5 and 6 (pp30–33). Only the first computation annexure, Annexure 1A for SHP below 5 MW in Himachal Pradesh, Uttarakhand, West Bengal, J&K, Ladakh and NE States, is supplied, showing assumptions and a year-wise fixed-cost build-up (pp34–35).
Read with this
The regulation
- Dated 12 Jun 2024Renewable Energy Tariff Regulations, 2024
Commencement notices and reasons
- Dated 17 Sep 2024RE Tariff Regulations, 2024 — Statement of Reasons
Procedures and orders made under it
Other copies of these documents (1)
- Dated 12 Jun 2024RE Tariff Determination Regulations, 2024
Earlier drafts
- Dated 17 Feb 2024Renewable Energy Tariff Determination Regulations, 2024 — Draft
- Dated 17 Feb 2024Public notice: Draft Terms and Conditions for Tariff Determination from Renewable Energy Sources Regulations, 2024 — Public Notice
- Released with the notice dated 17 Feb 2024Explanatory memorandum: Draft RE Tariff Regulations, 2024 — Explanatory Memorandum
3 more documents belong here and are not on Voltaic: 2 drafts or notices on a draft not held as English text and 1 draft or notice on a draft.
Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.