Skip to content

CERC · Central Electricity Regulatory Commission

Renewable Energy Tariff Determination Regulations, 2024 — Draft

Central Electricity Regulatory Commission (Terms and Conditions for Tariff determination from Renewable Energy Sources) Regulations, 2024

Draft regulationDated 17 Feb 2024RA-14026(11)/1/2023-CERC dated 17.02.2024

Draft

A proposal that has since been finalised as the Renewable Energy Tariff Regulations, 2024.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a draft notification issued by the Central Electricity Regulatory Commission on 17.02.2024, setting out the Central Electricity Regulatory Commission (Terms and Conditions for Tariff determination from Renewable Energy Sources) Regulations, 2024, made under section 61 read with section 178(2)(s) of the Electricity Act, 2003 (p1). The regulations come into force on 01.04.2024 and remain in force up to 31.03.2027 unless reviewed earlier or extended, and the control period runs from 01.04.2024 to 31.03.2027 (p1, p9).

Regulations 1 to 4 define the terms used, set the scope — tariffs to be determined by the Commission under section 62 read with section 79 of the Act for grid-connected renewable generating stations commissioned during the control period — and lay out technology-wise eligibility criteria (pp1–9). Eligibility turns on new plant and machinery, MNRE-approved technologies and siting, a minimum 33% of installed capacity from one renewable source for hybrid projects, a 25 MW ceiling for small hydro, and a topping-cycle test for co-generation (pp3–8).

Chapter 1 (Regulations 5–11) establishes the control period, the split between generic and project-specific tariffs, the petition procedure and fee, the tariff structure and design, and treatment of over-generation (pp9–13). Chapter 2 (Regulations 12–23) sets the financial principles: capital cost scope, debt-equity ratio, loan tenure and interest, depreciation, return on equity, working capital, capacity utilisation/plant load factor hours, O&M expenses and escalation, rebate, late payment surcharge, subsidy and incentive treatment, and recovery of statutory charges (pp13–18).

Chapters 3 to 12 deal technology by technology — wind, small hydro, biomass (Rankine cycle), non-fossil fuel co-generation, solar PV/thermal/floating, biomass gasifier, biogas, MSW and RDF, renewable hybrid, and renewable energy with storage — specifying for each the basis for capital cost, capacity utilisation factor or plant load factor, auxiliary consumption, station heat rate, gross calorific value, fuel cost, O&M expenses and, for hybrid and storage projects, how the composite or time-of-day tariff is built (pp18–31). Chapter 13 allows tariff to be agreed in deviation from the norms with the norms-based levelised tariff as the ceiling, and gives the Commission power to relax provisions and to remove difficulties (pp31–32). The Appendix contains the forms to be filed with tariff petitions (pp33–42).

Standard name
Renewable Energy Tariff Regulations
Primary topics
Renewable energy tariff, Tariff determination, Multi Year Tariff (MYT)

Read with this

The regulation

Commencement notices and reasons

Other copies of these documents (1)

Earlier drafts

3 more documents belong here and are not on Voltaic: 2 drafts or notices on a draft not held as English text and 1 draft or notice on a draft.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document