MERC · Maharashtra Electricity Regulatory Commission

Multi Year Tariff Regulations, 2019

Maharashtra Electricity Regulatory Commission (Multi Year Tariff) Regulations, 2019

RegulationDate not statedNo. MERC/Tech/Regulation/2019/471

Replaced by Multi Year Tariff Regulations, 2024

See that regulation for the date it took effect and for anything it keeps in force.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on merc.gov.in ↗

Summary

Summary written by software, from pages 1 to 34 of 162. Check the regulator's original before you rely on it.

The Maharashtra Electricity Regulatory Commission (Multi Year Tariff) Regulations, 2019 are the State's principal five-year tariff framework. Issued under the Electricity Act, 2003 and extending to the whole of Maharashtra, they apply to existing and future Generation Companies, Transmission Licensees, Distribution Licensees, MSLDC and their successors for determination of Aggregate Revenue Requirement, tariff, and MSLDC fees and charges (p6). The stated applicability is April 1, 2020 to March 31, 2025, with the Commission able to extend the Control Period (pp6, 12). The Regulations come into force from publication in the Official Gazette, but no Gazette date is printed. They supersede the MYT Regulations, 2015; matters up to March 31, 2020, including review matters, continue under the 2005/2011/2015 regulations as applicable (p6).

Pages 1–5 are the contents/arrangement list. Pages 6–23 set preliminary matters: short title, extent, applicability and commencement; an extensive definitions clause; and the scope of tariff determination, including generation supply other than from renewable sources, intra-State transmission, intervening transmission, wheeling, retail supply, MSLDC fees, cross-subsidy surcharge and additional surcharge (pp6–24). Regulation 3.2 requires the Commission to adopt tariffs determined through transparent Section 63 bidding guidelines (p24).

Part A (Regs 4–11, pp24–36) establishes the MYT framework: multi-year forecasts of ARR and revenue, tariff determination for each control-period year, mid-term review, true-up for earlier years, trajectories for specified variables, and classification of controllable and uncontrollable factors with mechanisms for pass-through or sharing of gains/losses. Regulation 5 fixes petition filing points—MYT, mid-term review and true-up petitions, with different dates for generating/transmission/SLDC and distribution licensees—and bars carrying cost for delay (pp25–27, 30). Regulation 10 sets the monthly Z-factor/fuel adjustment charge pass-through for fuel, power purchase and inter-State transmission cost variations, with prior approval for the first month and quarterly post facto approval thereafter (pp31–34).

Part B (Regs 12–17, pp36–42, contents p1) covers the procedure for tariff determination: filing tariff petitions, generation tariff, tariffs and fees for transmission, distribution wires, retail supply and MSLDC, tariff orders, adherence, and deviation from ceiling tariff. Part C (Regs 18–22, pp42–46) covers power procurement: applicability, guidelines, procurement plan, approval of long-term/medium-term PPAs and additional procurement.

Part D (Regs 23–37, pp47–76) lays down financial principles: prudence, capital cost and capital structure, additional capitalisation, consumer contributions/deposit works/grants/subsidies, debt-equity ratio, depreciation, return on equity, interest on loan, foreign exchange variation, interest on working capital, carrying/holding cost, income tax, contingency reserves, rebates/incentives/penalties, and delayed payment charges (contents p2).

Part E (Regs 38–55, pp77–110) covers generation, from applicability and petition requirements through fuel utilisation plan, tariff components, annual fixed charges, renovation and modernisation, infirm power, non-tariff income, operational norms and O&M for thermal and hydro stations, capacity and energy charge computation, pumped storage, declared capacity, billing and deviation charges (contents pp2–3). Part F (Regs 56–70, pp111–126) covers transmission: tariff components, provisional tariff, capital investment, operational norms, O&M, non-tariff and other-business income, intra-State transmission tariff, sharing of TTSC by long-term TSUs, transmission pricing, billing, losses and reactive energy charges (contents p3).

Part G (Regs 71–79, pp127–135) covers the distribution wires business: account separation, applicability, ARR components, capital investment, O&M, bad and doubtful debts, non-tariff and other-business income, and wheeling losses. Part H (Regs 80–91, pp135–143) covers retail supply: ARR components, sales forecast, capital investment, O&M, bad debts, non-tariff/other income, cross-subsidy and additional surcharge receipts, distribution losses and retail tariff determination (contents pp3–4).

Part I (Regs 92–101, pp144–150) covers MSLDC fees and charges: capital investment, LDC Development Fund, annual fixed charges, O&M, RLDC fees and WRPC charges, non-tariff income, sharing of charges and billing. Part J (Reg 102, pp150–151) specifies the manner of grant of subsidy by the State Government. Part K (Regs 103–106, p151) gives powers on practice directions, amendment, relaxation and removal of difficulties (contents pp4–5). Annexures I–III (contents p5; pp152–162) hold the depreciation schedule, the procedure for calculating monthly transmission system availability, and the computation of mean time between failure.

Parts B–K and the Annexures are known here only from the contents list.

Standard name
Multi Year Tariff Regulations
Primary topics
Multi Year Tariff (MYT), Tariff determination, ARR and true-up

Read with this

Amendments and corrections

Earlier drafts

7 more documents belong here and are not on Voltaic: 4 drafts or notices on a draft and 3 drafts or notices on a draft not held as English text.

Voltaic last read MERC's website for final documents on 24 Nov 2026 (8 pages) and for drafts on 24 Nov 2026. A document MERC issued after the page that lists it was read may not be held by Voltaic yet.