Skip to content

DERC · Delhi Electricity Regulatory Commission

Delhi Electricity Supply Code and Performance Standards, 2007 — Third Amendment Regulations, 2016 — Draft

Delhi Electricity Supply Code and Performance Standards (Third Amendment) Regulations, 2016

Draft amendmentDated 11 Feb 2016F.17(85)/Engg./DERC/15-16/Part File/5093/

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on derc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The document is a DERC draft notification for the Third Amendment to the Delhi Electricity Supply Code and Performance Standards Regulations, 2007. It is made under Section 50 read with Sections 57, 86 and 181 of the Electricity Act 2003 and is to take effect from publication in the official Gazette (p1).

Part 1.0 gives the short title and commencement (p1). Part 2.0 amends Regulation 21 on load reduction: it adds a six-month bar on repeat load-reduction applications, or the six-month lock-in under new Regulation 23A(11); requires the licensee to change the meter and service line where reduced load needs it without recovering SLD charges; and caps load reduction at the highest average of any four consecutive months' maximum demand readings in the last twelve months (p1).

Part 3.0 inserts a new Regulation 23A, under which the licensee reviews sanctioned load/contract demand using maximum demand readings (p1–2). It sets rounding conventions and a 1 kW minimum (p2), and prescribes separate methods for domestic and non-domestic consumers, based on the highest average of any four consecutive months' maximum demand readings from 1 April to 31 March of the previous financial year (p2–3). It then lays out the notice, consent and billing process for upward and downward revisions, security deposit and differential SLD treatment, and the annual timetable: notice by 30 April, revision once a financial year, effective after 30 days and no later than 1 June (p3–4). SLD receipts go to the licensee's capital account (p4).

The Notes state that specified prior DERC directions are superseded by these Regulations, but cases already dealt with under them will not be reopened (p4–5).

Standard name
Electricity Supply Code, Standards of Performance
Primary topics
New connections and load changes, Connection and miscellaneous charges, Metering

Read with this

Voltaic last read DERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document DERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on derc.gov.in ↗

Report an issue with this document