Delhi Electricity Supply Code and Performance Standards (Amendment) Regulations, 2015

AmendmentDated 23 Mar 2015Published in the Gazette 23 Mar 2015F.17(85)/Engg/DERC/2013-14 C.F.No.4074/4903 dated 23rd March, 2015

Replaced by Delhi Supply Code and Performance Standards Regulations, 2017

See that regulation for the date it took effect and for anything it keeps in force.

Amends the Delhi Electricity Supply Code and Performance Standards Regulations, 2007.

Saving clause of the regulation that replaces it: “Notwithstanding such repeal, anything done or action taken or purported to have been taken, or proceedings initiated under such repealed Regulations, shall be deemed to have been taken under these Regulations to the extent that same were not inconsistent with the Act.”

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on derc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a short DERC amendment regulation issued and gazetted on 23 March 2015 (p1, p3). Made under section 50 with sections 57, 86 and 181 of the Electricity Act 2003, it amends the Delhi Electricity Supply Code and Performance Standards Regulations, 2007 ("the Principal Regulations") and takes effect from the date of Gazette publication (p3).

Regulation 1 gives the short title and commencement (p3). Regulation 2 substitutes Regulation 16 of the Principal Regulations in full, governing new electricity connections in electrified colonies and areas (p3–5). The substituted text sets an end-to-end workflow with deadlines: application in the prescribed form or online, written intimation of deficiencies with deemed acceptance if the licensee stays silent, field inspection in the applicant's presence with defined grounds for refusing to sanction load, load sanction and a demand note with break-up of charges, a payment window with a request-based extension that is excluded from the total energisation time, and energisation from the existing network through a correct meter (p4). Delays beyond the stipulated periods attract compensation under Schedule III after a hearing, adjustable in the consumer's bills, with carve-outs for matters outside the licensee's control such as right of way, land acquisition and road-cutting permission (p4–5). It also fixes first-bill issuance timing and a compensation trigger if no bill is raised within four billing cycles, and provides for interest on security deposit at 6% per annum for new connections (p5).

Regulation 3 substitutes Table 4 of Regulation 30, replacing the service line cum development charges with a slab structure keyed to sanctioned load, with the top slabs priced per kVA or as a share of HT cable/line/switchgear cost (p3, p5).

Standard name
Electricity Supply Code, Standards of Performance
Primary topics
New connections and load changes, Connection and miscellaneous charges, Billing and payment

Read with this

Voltaic last read DERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document DERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on derc.gov.in ↗

Report an issue with this document